137
Commissioning
1.
Turn pressure control to
lowest pressure.
2.
Turn power ON.
3.
Increase the pressure by
half to start the motor and
allow the fluid to circulate
through the drain tube for
15 seconds; then decrease
the pressure again.
4.
Turn prime valve up to
SPRAY position. Take
spray gun trigger safety
OFF.
5.
Hold the spray gun against
an earthed flushing pail.
Activate the trigger and
turn the pressure regulator
clockwise through a half
rotation.
6.
Make sure the screw con-
nections are tight. Do not
try to seal leaks with your
hand or a cloth. If leaks
occur, relieve the pressure
immediately. Tighten the
screw connections firmly.
Run through steps 1 - 5 of
the commissioning proce-
dure. If there are no leaks,
proceed to step 6.
7.
Place siphon tube in paint
container.
8.
Trigger gun again into
flushing container until
paint appears. Move gun
to paint container and trig-
ger for 20 seconds. Acti-
vate safety (ON). Assem-
ble nozzle and guard, see
instructions on next page.
Summary of Contents for SL 1500
Page 21: ...21 ...
Page 24: ...24 Bauteile ...
Page 26: ...26 Bauteile ...
Page 53: ...53 ...
Page 56: ...56 Onderdelen ...
Page 58: ...58 Onderdelen ...
Page 85: ...85 ...
Page 88: ...88 Composants ...
Page 90: ...90 Composants ...
Page 117: ...117 ...
Page 120: ...120 Componenti ...
Page 122: ...122 Componenti ...
Page 149: ...149 ...
Page 152: ...152 Parts ...
Page 154: ...154 Parts ...
Page 181: ...181 ...
Page 184: ...184 Konstrukční díly ...
Page 186: ...186 Konstrukční díly ...
Page 194: ...194 ...
Page 195: ...195 ...