Commissioning the E frames
Coupling and uncoupling the E
frames
Aligning chassis in drive direction
The chassis are aligned according to the side
on which the Trolleys are to be loaded and
unloaded.
Loading and unloading the trolleys from the
left:
– Set up the chassis in the drive direction with
the opening (1) to the left.
Loading and unloading the trolleys from the
right:
– Position the frames so that the opening is
on the right-hand side in the drive direction.
E chassis
NOTE
The tiller’s orientation when it is mounted on
the chassis depends on whether the trolleys
are to be loaded into the chassis from the left
or right.
NOTE
Appearance of the frame and tiller may vary
slightly from the figure.
Coupling the E frames
WARNING
Risk of trapping or crushing!
– Do not reach into the open coupling.
– The tow tractor and the trailer must be on level
ground and must be secured so they cannot roll
away.
CAUTION
A tugger train with E frames must always consist of
at least two frames and a tow tractor.
76
50988012117 [EN]
Summary of Contents for Tugger train Autarkic E Frame
Page 2: ......
Page 7: ...1 Foreword ...
Page 14: ...1 Foreword Environmental considerations 8 50988012117 EN ...
Page 15: ...2 Introduction ...
Page 20: ...2 Introduction Residual risk 14 50988012117 EN ...
Page 21: ...3 Safety ...
Page 28: ...3 Safety Safety regulations for handling consumables 22 50988012117 EN ...
Page 29: ...4 Overviews ...
Page 61: ...5 Operation ...
Page 121: ...6 Servicing ...
Page 132: ...6 Servicing Consumables 126 50988012117 EN ...
Page 133: ...7 Technical data ...
Page 142: ......
Page 143: ......
Page 144: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 50988012117 EN ...