Foreword
1
Environmental considerations
Tugger train
The unit consisting of the frames and a tow
tractor is known as the "tugger train".
Environmental considerations
Packaging
When the chassis are delivered, certain parts
are packaged to provide protection during
transportation. This packaging must be
removed completely prior to commissioning.
ENVIRONMENT NOTE
The packaging material must be properly
disposed of after delivery of the chassis.
Disposal of units and hydraulic oil
It may be necessary to exchange units as part
of maintenance work. Exchanged units must
then be disposed of.
A chassis is made of different materials. Each
of these materials must be
• disposed of,
• treated or
• recycled in accordance with regional and
national regulations.
ENVIRONMENT NOTE
We recommend working with a waste mana-
gement company for disposal of hydraulic oil
or other hazardous materials.
50988012117 [EN]
7
Summary of Contents for Tugger train Autarkic E Frame
Page 2: ......
Page 7: ...1 Foreword ...
Page 14: ...1 Foreword Environmental considerations 8 50988012117 EN ...
Page 15: ...2 Introduction ...
Page 20: ...2 Introduction Residual risk 14 50988012117 EN ...
Page 21: ...3 Safety ...
Page 28: ...3 Safety Safety regulations for handling consumables 22 50988012117 EN ...
Page 29: ...4 Overviews ...
Page 61: ...5 Operation ...
Page 121: ...6 Servicing ...
Page 132: ...6 Servicing Consumables 126 50988012117 EN ...
Page 133: ...7 Technical data ...
Page 142: ......
Page 143: ......
Page 144: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 50988012117 EN ...