Operation
5
Assembling the articulated steering system (driving over ramps)
– Tighten the clamping bolts evenly (tighten-
ing torque: 30 Nm) and secure the clamping
bolts with nuts (tightening torque: 50 Nm).
NOTE
This tightening braces the tiller against the E
frame and provides protection against lateral
swivelling movements.
Removing
– Loosen the nuts and the clamping bolts.
– Release the coupling pin and remove the
compensating hinge from the towing jaws.
Installing and removing the hinged
tiller
Installing
The following section describes the procedure
when loading and unloading is performed on
the left-hand side in the drive direction.
50988012117 [EN]
69
Summary of Contents for Tugger train Autarkic E Frame
Page 2: ......
Page 7: ...1 Foreword ...
Page 14: ...1 Foreword Environmental considerations 8 50988012117 EN ...
Page 15: ...2 Introduction ...
Page 20: ...2 Introduction Residual risk 14 50988012117 EN ...
Page 21: ...3 Safety ...
Page 28: ...3 Safety Safety regulations for handling consumables 22 50988012117 EN ...
Page 29: ...4 Overviews ...
Page 61: ...5 Operation ...
Page 121: ...6 Servicing ...
Page 132: ...6 Servicing Consumables 126 50988012117 EN ...
Page 133: ...7 Technical data ...
Page 142: ......
Page 143: ......
Page 144: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 50988012117 EN ...