
Options
Operation & maintenance instructions (Version H)
85
SKY-200/250
9
9.3
Extensions
Follow the next described procedure to assemble the extensions:
1.
Suspend the extension (1) at the end of the track.
2.
Mount the bolts (2), washers (3) and nuts (4). Do not tighten them yet.
3.
Mount the bolts (5), washers (6) and nuts (7). Do not tighten them yet.
4.
Align the extension with the track, using the adjusment plates (8, 9, 10).
5.
Now tighten the bolts and nuts.
• Tightening torque for M16 = 170 Nm (124 lbf ft).
• Tightening torque for M20 = 350 Nm (255 lbf ft).
6.
If a wheel lifter is used, mount the parts 11 upto 14 and 19 upto 22. Use shims (14)
to adjust the corner piece (11) to the defined height. Tightening torque M12 = 70 Nm
(50 lbf ft).
7.
Finally mount the drive-on part and the end part of the track (15 upto 18).
Figure 9.7
Extensions
2
1
8, 9, 10
15
16
20
21
22
18
17
19
5
3
4
7
6
13
14
11
12
Summary of Contents for SKY-200
Page 152: ...Operation maintenance instructions Version H 152 SKY 200 250 ...
Page 153: ......