API plan 52/ ISO codes 10, 03 – Circulating quench
A non-pressurised barrier fluid
is connected, flowing from an
external source and circulating
between both shaft seals.
3.18.9 Guidelines for assembly
When a bare shaft pump is delivered, the assembly with drive is the responsibility of the user.
The user also must provide all necessary devices and equipment allowing a safe installation and
commissioning of the pump.
3.18.9.1 Transport of pump unit
• Prior to lifting and transporting a pump unit, make sure that the packaging is of sturdy enough
construction is and will not be damaged during transport.
• Use crane hooks in the base plate or the frame. (See chapter 1.0.)
3.18.9.2 Foundation pump unit
The pump unit must be installed on a base plate or on a frame placed exactly level on the founda-
tion. The foundation must be hard, level, flat and vibration free in order to guarantee the alignment of
pump/drive while operating. (See section 3.18.2.5)
3.18.9.3 Variators, Gear box, Gear motors, Motors
Consult the supplier’s instruction manual included with the delivery.
Contact the pump supplier if the manual is not included.
Summary of Contents for TG H15-50
Page 103: ...103 A 0500 351 IM TGH 07 00 EN 10 2015...
Page 105: ...105 A 0500 351 IM TGH 07 00 EN 10 2015...
Page 106: ...106 A 0500 351 IM TGH 07 00 EN 10 2015...
Page 107: ...107 A 0500 351 IM TGH 07 00 EN 10 2015...
Page 108: ...108 A 0500 351 IM TGH 07 00 EN 10 2015...
Page 109: ......