June 11, 2020
9
902-293 6’ IND. SECTIONAL SLIDE (VL)
INSTALLATION INSTRUCTIONS
INSTALLATION STEPS CONTINUED
__9)
Attaching the Handrails to the Structure:
With help, insert the end of the handrail with the threads welded
into it into the stub of the guard wall. Attach the handrails to the
guard wall using a 2” bolt (14) and a flat washer (10).
Hand
tighten only.
See Detail E.
Attach the Independent Slide Handrails (5) to the steps (2) using
four 2-¼” bolts (12), eight 3/8” flat washers, and four 3/8” lock
nuts (11).
Hand tighten only.
See Detail F.
Repeat on the other side.
Detail E
Detail F