background image

June 11, 2020 

902-293 6’ IND. SECTIONAL SLIDE (VL)

     INSTALLATION INSTRUCTIONS 

PARTS LIST 

ID 

PART # 

DESCRIPTION 

QTY 

435-640LR

6’ Sectional Slide 

435-640LR

Support Brace 

435-640LR

Slide Hardware Bag 

905-712

Step to 6’ Deck 

913-230

Transfer Point Inside Leg 

913-712

Indep. Slide Post 

913-714

Indep. Slide Handrail 

913-721L

Ind. Sec. Slide Left Guard Wall 

913-721R

Ind. Sec. Slide Right Guard Wall 

913-720

Indep. Sec. Slide Deck 

903-214

T Leg for DW Slide 

10 

316-601

3/8” Flat Washer SS 

57 

11 

226-602

3/8” Nylon Insert Lock Nut 

23 

12 

126-708

3/8”x 2 ¼” Button Pin SS 

13 

126-703

3/8”x 1” Button Pin SS 

14 

126-705

3/8”x 2” Button Pin SS 

15 

126-706BPS

3/8” x 1 ¾” Button Pin SS 

16 

126-701BPS

3/8” x 1 ¼” Button Pin SS 

10 

17 

516-200

3/8” Zip Toggle 

18  416-402BPK

7/32 Button Pin Key Short Arm 

NOTE:

 Keep a copy of these instructions on file to assist you 

with maintenance and replacement parts. 

Summary of Contents for 902-293 6' IND. SECTIONAL SLIDE

Page 1: ...F1292 is required MAINTENANCE As the owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected fr...

Page 2: ...ft Guard Wall 1 7 913 721R Ind Sec Slide Right Guard Wall 1 8 913 720 Indep Sec Slide Deck 1 9 903 214 T Leg for DW Slide 2 10 316 601 3 8 Flat Washer SS 57 11 226 602 3 8 Nylon Insert Lock Nut 23 12...

Page 3: ...the bottom of the support post or slide leg on a suitable flat blocking material to prevent it from sinking further into the soil We recommend you use a brick block of wood or several inches of gravel...

Page 4: ...June 11 2020 4 902 293 6 IND SECTIONAL SLIDE VL INSTALLATION INSTRUCTIONS ELEVATION AND FOOTING LAYOUT...

Page 5: ...f the four hole bracket with the self tapping screws easier and it will prevent damage to the screw head during installation Apply locktite to all bolts during assembly prior to completely tightening...

Page 6: ...ate placement of the Independent Sectional Slide See top down view of your instruction booklet __4 Layout the Footing holes for the Independent Sectional Slide Locate your footing drawing and mark you...

Page 7: ...pendent Sectional Slide Deck 8 using three 1 bolts 13 six 3 8 flat washers 10 and three 3 8 lock nuts 11 Hand tighten only See Detail B __7 Attach Transfer Point Inside Legs to Steps With the steps in...

Page 8: ...Sectional Slide Deck There is a left side 6 and a right side guard wall 7 The tabs will attach to the slide and will be parallel to each other Attach the Independent Sectional Slide Guard Wall 6 7 to...

Page 9: ...andrail with the threads welded into it into the stub of the guard wall Attach the handrails to the guard wall using a 2 bolt 14 and a flat washer 10 Hand tighten only See Detail E Attach the Independ...

Page 10: ...ads on the slide entrance side Hand tighten only Once the slide is in place the nuts will need to be removed to attach the support brace __11 Attach the Slide to the Deck Hoist the slide to the deck a...

Page 11: ...ill a hole for each tab and insert a 3 8 Zip toggler 17 in each hole To secure the tabs to the slide use two 2 bolts 14 and two 3 8 flat washers 10 Hand tighten only See Detail K __15 Once full instal...

Page 12: ...June 11 2020 12 902 293 6 IND SECTIONAL SLIDE VL INSTALLATION INSTRUCTIONS THIS PAGE INTENTIONALLY LEFT BLANK...

Page 13: ...cracks If a crack is found block access to the playground and contact your distributor for replacement parts immediately Finish Inspect all metal components for coating damage If powder coating needs...

Page 14: ...ST AS WELL AS ANY NOT LISTED INCLUDE DATES AND SIGNATURES Inspection Checklist Recommended Frequency Grade Pass Fail NA Date Inspected Date Repairs Completed Inspect Brackets Weekly Inspect Hardware W...

Reviews: