902-293 6’ IND. SECTIONAL SLIDE (VL)   

                                                                                                                           INSTALLATION INSTRUCTIONS 

 

 

INSTALLATION DETAILS 

 

Recommended crew (Adult)

: 2

 

 

Installation time

: 4 (8 man hrs)

 

 

User age

: 5-12

 

 

Use zone

: 72 in from all sides of unit 

 

Weight

:  

 

SURFACING: Use of safety surfacing in compliance with 

ASTM specification F1292 is required. 

MAINTENANCE: 

 

As the owner of the playground you are responsible for 

maintenance of the equipment and play area.  A 

maintenance schedule must be developed, and the 

equipment inspected frequently.  A maintenance section 

that includes component specific maintenance 

requirements is included at the end of this manual. 

 

Be sure to inspect surfacing for foreign objects that could 

cause injury and that enough surfacing is in place in 

accordance with ASTM and CPSC standards. 

Summary of Contents for 902-293 6' IND. SECTIONAL SLIDE

Page 1: ...F1292 is required MAINTENANCE As the owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected fr...

Page 2: ...ft Guard Wall 1 7 913 721R Ind Sec Slide Right Guard Wall 1 8 913 720 Indep Sec Slide Deck 1 9 903 214 T Leg for DW Slide 2 10 316 601 3 8 Flat Washer SS 57 11 226 602 3 8 Nylon Insert Lock Nut 23 12...

Page 3: ...the bottom of the support post or slide leg on a suitable flat blocking material to prevent it from sinking further into the soil We recommend you use a brick block of wood or several inches of gravel...

Page 4: ...June 11 2020 4 902 293 6 IND SECTIONAL SLIDE VL INSTALLATION INSTRUCTIONS ELEVATION AND FOOTING LAYOUT...

Page 5: ...f the four hole bracket with the self tapping screws easier and it will prevent damage to the screw head during installation Apply locktite to all bolts during assembly prior to completely tightening...

Page 6: ...ate placement of the Independent Sectional Slide See top down view of your instruction booklet __4 Layout the Footing holes for the Independent Sectional Slide Locate your footing drawing and mark you...

Page 7: ...pendent Sectional Slide Deck 8 using three 1 bolts 13 six 3 8 flat washers 10 and three 3 8 lock nuts 11 Hand tighten only See Detail B __7 Attach Transfer Point Inside Legs to Steps With the steps in...

Page 8: ...Sectional Slide Deck There is a left side 6 and a right side guard wall 7 The tabs will attach to the slide and will be parallel to each other Attach the Independent Sectional Slide Guard Wall 6 7 to...

Page 9: ...andrail with the threads welded into it into the stub of the guard wall Attach the handrails to the guard wall using a 2 bolt 14 and a flat washer 10 Hand tighten only See Detail E Attach the Independ...

Page 10: ...ads on the slide entrance side Hand tighten only Once the slide is in place the nuts will need to be removed to attach the support brace __11 Attach the Slide to the Deck Hoist the slide to the deck a...

Page 11: ...ill a hole for each tab and insert a 3 8 Zip toggler 17 in each hole To secure the tabs to the slide use two 2 bolts 14 and two 3 8 flat washers 10 Hand tighten only See Detail K __15 Once full instal...

Page 12: ...June 11 2020 12 902 293 6 IND SECTIONAL SLIDE VL INSTALLATION INSTRUCTIONS THIS PAGE INTENTIONALLY LEFT BLANK...

Page 13: ...cracks If a crack is found block access to the playground and contact your distributor for replacement parts immediately Finish Inspect all metal components for coating damage If powder coating needs...

Page 14: ...ST AS WELL AS ANY NOT LISTED INCLUDE DATES AND SIGNATURES Inspection Checklist Recommended Frequency Grade Pass Fail NA Date Inspected Date Repairs Completed Inspect Brackets Weekly Inspect Hardware W...