Installation
08|2020 EN
35
5.4.5 Preparation
of the motor cable
WARNING
Electric shock when working on the motor!
Make sure that the motor is voltage-free and that the cables
are disconnected from the power source before beginning
installation.
Never connect or disconnect cables as long as the circuit is
closed.
The motor cable must be prepared by the following steps:
1. Shorten the cable if necessary (customer end).
2. Plug the cap and the plastic inlay of the EMC gland onto
the cable. The lugs on the plastic part must face towards
the end of the cable.
3. The end of the cable must be stripped over a length of 14
cm. To strip the sheath, it must be slit carefully lengthwise.
4. Open the shield around the wires and fold back. Cut off the
shield to a length of 2 cm.
5. Remove the transparent plastic sheath of the wires.
6. The enclosed copper band must be stuck all round the 2
cm shield so that none of the shield is visible any more.
Summary of Contents for BADU BADUJET Turbo Pro
Page 1: ...EN EN Translation of original operation manual Submerged counter swim unit ...
Page 20: ...Installation 20 EN 08 2020 Pool cutout for concrete pools formwork Fig 4 ...
Page 21: ...Installation 08 2020 EN 21 Installation of formwork for concrete pools Fig 5 ...
Page 34: ...Installation 34 EN 08 2020 5 4 4 Control cable wiring diagram Fig 18 ...
Page 49: ...Technical Data 08 2020 EN 49 10 2 Exploded drawing Fig 26 ...