![Speck pumpen BADU BADUJET Turbo Pro Translation Of Original Operation Manual Download Page 12](http://html.mh-extra.com/html/speck-pumpen/badu-badujet-turbo-pro/badu-badujet-turbo-pro_translation-of-original-operation-manual_1341777012.webp)
Safety
12 EN
08|2020
2.9 Preventing
material
damage
2.9.1 Leakage
at
the
installation housing
Non-observance of the curing time of the ABS bonding can result
in leaks and flooding
Observe the curing time of at least 12 hours for the ABS
bonding
Provide sufficient ground drainage
Install the unit in a manner which reduces structure-borne
and airborne noise transmission. When doing so, observe
relevant regulations.
In the event of leakage, the system may not be operated and
must be disconnected from the mains.
2.9.2 Water splashes over the edge of the pool
Water splashing over the edge of the pool can have the following
reasons:
•
Wrong dimensioning of the pool.
•
Overflow gutters and splash-water tank too small.
2.9.3 Dry
running
Slide bearings and plastic parts can be destroyed within a few
seconds when running dry.
Do not allow the unit to run dry. This also applies to checking
the rotation direction.
Only start the system when the water level is 350 mm above
the system centre.
2.9.4 Overheating
The following factors can lead to overheating of the system:
•
Water level too low.
•
Ambient temperature which is too high.
•
Motor overload switch set incorrectly.
•
Blockage of the suction guard by fibres, items of clothing,
hairs, leaves, bathing towel etc.
Raise the water level.
Do not exceed the permitted ambient temperature of 40 °C.
Avoid
blockages
and/or
clear existing blockages.
2.9.5 Blockage of the drive
Particles of dirt can block the system. This leads to dry running
and overheating.
Avoid blockages by fibres, items of clothing, hairs, leaves,
bathing towel, etc.
Summary of Contents for BADU BADUJET Turbo Pro
Page 1: ...EN EN Translation of original operation manual Submerged counter swim unit ...
Page 20: ...Installation 20 EN 08 2020 Pool cutout for concrete pools formwork Fig 4 ...
Page 21: ...Installation 08 2020 EN 21 Installation of formwork for concrete pools Fig 5 ...
Page 34: ...Installation 34 EN 08 2020 5 4 4 Control cable wiring diagram Fig 18 ...
Page 49: ...Technical Data 08 2020 EN 49 10 2 Exploded drawing Fig 26 ...