![Speck pumpen BADU BADUJET Turbo Pro Translation Of Original Operation Manual Download Page 31](http://html.mh-extra.com/html/speck-pumpen/badu-badujet-turbo-pro/badu-badujet-turbo-pro_translation-of-original-operation-manual_1341777031.webp)
Installation
08|2020 EN
31
5.3.8 Installation
example
Fig. 16
5.4 Electrical
connection
(Qualified specialist)
WARNING
Mortal danger due to incorrect electrical connection!
The PTC in the motor must be connected to the frequency
converter as intended!
It must not be bridged or manipulated in any other way.
This applies equally in commissioning or repair situations.
The manufacturer must be contacted for integration of other
safety switches in the stop circuit of the frequency converter
(FC-Trip).
WARNING
Risk of electric shock from residual charge of the frequency
converter capacitors!
Work may be carried out on the load current circuit after
switching off and waiting 10 minutes.
Summary of Contents for BADU BADUJET Turbo Pro
Page 1: ...EN EN Translation of original operation manual Submerged counter swim unit ...
Page 20: ...Installation 20 EN 08 2020 Pool cutout for concrete pools formwork Fig 4 ...
Page 21: ...Installation 08 2020 EN 21 Installation of formwork for concrete pools Fig 5 ...
Page 34: ...Installation 34 EN 08 2020 5 4 4 Control cable wiring diagram Fig 18 ...
Page 49: ...Technical Data 08 2020 EN 49 10 2 Exploded drawing Fig 26 ...