![Speck pumpen BADU BADUJET Turbo Pro Translation Of Original Operation Manual Download Page 30](http://html.mh-extra.com/html/speck-pumpen/badu-badujet-turbo-pro/badu-badujet-turbo-pro_translation-of-original-operation-manual_1341777030.webp)
Installation
30 EN
08|2020
5.3.6 Installing the motor unit
1. Place the motor unit cpl. (2) on the centring of the seal
housing (31) so that the motor plug is on the top.
2. Fix by tightening the 6 hexagon socket head tapping screws
(7 x 48 (29)) with a torque of 9 Nm.
CAUTION
Risk of injury due to magnetic forces.
Pay attention to this when installing/removing the motor unit!
Fig. 15
5.3.7 Possibilities for using the connection nozzle (rear wall)
The connection nozzle (c) can be used for:
• active
overwintering
•
circulation, avoidance of accumulation of water in the
installation housing
• emptying
Summary of Contents for BADU BADUJET Turbo Pro
Page 1: ...EN EN Translation of original operation manual Submerged counter swim unit ...
Page 20: ...Installation 20 EN 08 2020 Pool cutout for concrete pools formwork Fig 4 ...
Page 21: ...Installation 08 2020 EN 21 Installation of formwork for concrete pools Fig 5 ...
Page 34: ...Installation 34 EN 08 2020 5 4 4 Control cable wiring diagram Fig 18 ...
Page 49: ...Technical Data 08 2020 EN 49 10 2 Exploded drawing Fig 26 ...