![Speck pumpen BADU BADUJET Turbo Pro Translation Of Original Operation Manual Download Page 13](http://html.mh-extra.com/html/speck-pumpen/badu-badujet-turbo-pro/badu-badujet-turbo-pro_translation-of-original-operation-manual_1341777013.webp)
Safety
08|2020 EN
13
2.9.6 Wrong rotation direction of the turbines
Wrong rotation direction due to:
•
Wiring not according to the circuit diagram (e.g. wire labelling
not observed)
•
Water outflow direction at the nozzle not checked.
The installer must check the outflow direction with a
swimming object.
2.9.7 Risk
of
frost
It is recommended to remove the drive unit during the frost period
and store it in a dry room.
Drain the unit and pipes at risk of freezing in plenty of time.
2.9.8 Water
temperature
The water temperature must not exceed 35 °C.
2.9.9 Safe use of the product
Safe use of the product is no longer guaranteed in the following
instances:
•
When the front panel is blocked.
• When
the
drive
unit is seized.
•
When protective devices, e.g. front panel, are damaged or
missing.
•
When the electrical installation is defective.
2.9.10 Contamination of the unit
Pay attention to clean work stations when working on the unit. No
magnetisable metallic particles may be kept in the vicinity of the
magnetic coupling.
Summary of Contents for BADU BADUJET Turbo Pro
Page 1: ...EN EN Translation of original operation manual Submerged counter swim unit ...
Page 20: ...Installation 20 EN 08 2020 Pool cutout for concrete pools formwork Fig 4 ...
Page 21: ...Installation 08 2020 EN 21 Installation of formwork for concrete pools Fig 5 ...
Page 34: ...Installation 34 EN 08 2020 5 4 4 Control cable wiring diagram Fig 18 ...
Page 49: ...Technical Data 08 2020 EN 49 10 2 Exploded drawing Fig 26 ...