20
Copyright © 2013 Somfy SAS. All rights reserved.
STOP
STOP
STOP
STOP
STOP
STOP
STOP
Position the opening stops in contact with the cylinder knob,
then tighten the stops with a 3 mm Allen key (2 screws per
stop).
6
Turn the Allen key
twice after contact.
Press button 1 on the remote control.
> The second gate leaf opens.
4
Press button 1 on the remote control again to stop the
gate leaf in the desired opening position.
5
Press button 1 on the remote control to close the gate
completely.
7
Check before proceeding to the next step
Have you set the position of the opening stop on each motor?
Programming the gate leaf travel
Somfy electronics automatically stores: the travel distances required
to fully open and close the gate leaves with the positions of the end
stops.
Once this is stored, this enables any abnormal motor effort to be
detected.
If the indicator light
is still flashing after 1 complete opening/closing cycle, start a new opening/closing cycle.
If the indicator light
continues flashing, consult the troubleshooting guide page 30.
The gate movements must not be interrupted (complete opening/closing).
If they are interrupted, programming will resume the next time the opening command is made.
Press button 1 on the remote control to initiate a COMPLETE
opening/closing motion of the gate.
The indicator light
on the control unit should be CONTINUOUSLY
LIT.
Keep your usual distance away from the gate when
programming the gate leaf travel.
1
2
Summary of Contents for SGS 201
Page 1: ...5073893A SGS 501 EN Operating and installation guide DE Montage und Gebrauchsanleitung ...
Page 70: ......
Page 71: ......