EN
Tilt & Li
,
25 RTS
17
Copyright
©
2018 SOMFY ACTIVITES SA, Société Anonyme All rights reserved.
2. INSTALLATION
Attention
• These instructions are
mandatory
for motorisation and
automation professional installing the drive.
• Never drop, knock, drill or submerge the motor.
• Install an individual control point for each motor.
2.1. ASSEMBLY
2.1.1. Drive preparation
1) Cut the sha
,
to the length required.
2) Position the headrail and sha
,
adapters on the
motor
2.1.2. Motor integration inside the headrail
1) Insert the motor in the headrail.
Attention
Take care not to cut the power supply
wires on the edges of the headrail when
introducing the motor.
2) Let the sha
,
abut against the motor sha
,
adapters.
!
For optimal radio reception, the antenna should
be kept straight and outside the headrail.
2
1
1
2