15K Pack HV Installation Manual
© 2020 Soluna Australia Pty Ltd
Page 9 of 25
Published date: November 2020
Remove the BS from its packaging and stand it upright. Check whether it is damaged.
All other items are contained in a box in one corner of the packaging. Remove them and check
whether any items are missing.
Note:
retain packaging for future storage or transportation.
Packing list
The following table lists the numbers of each item included. If anything is damaged or missing,
contact Soluna Australia or your distributor.
Item
Name
Qty
(pcs)
Remark
1
Soluna 15K PACK HV
1
2
Protective earthing conductor
(PE wire)
1
3
Inner-hexagon wrench (3.0)
1
4
Inner-hexagon wrench (4.0)
1
5
Inner-hexagon screws (M4)
4
6
Inner-hexagon screws (M6
)
2
7
Phillips screws
(
M6
)
10
8
Expansion screws
8
9
CAN communication wire
1
Installation materials
Installers should prepare the following installation materials.
1)
Charging cables
2)
Network cables
Installation location
Ensure that the installation location meets the following requirements.
1)
The building is designed to withstand earthquakes.
2)
The BS location is internal and out of direct sunlight.
3)
The floor is flat and level.
4)
There are no flammable or explosive materials nearby.
5)
The ambient temperature is between 15 and 30° Celsius.
6)
The temperature and humidity remain at a constant level.
7)
There is minimal dust and dirt in the area.
8)
There are no corrosive gases present, including ammonia and acid vapor.
If the ambient temperature is outside the operating range, the BS will stop operating to
protect itself. The optimal operating temperature range for the BS is 15° to 30° Celsius.
Frequent exposure to harsh temperatures may adversely affect the performance and
longevity of the BS.
Installation tools
The following tools are required to install the BS.