Item 

Photo 

Name 

 

Phillips-screwdriver bit 

 

Network crimper 

 

Wire cutter 

 

Wire stripper 

 

Tape measure 

 
All tools should be properly insulated to prevent an accidental electric shock or short circuits. 
Use adjustable tools and measuring instruments that are certified for precision and accuracy. 
 
 

 

Summary of Contents for 15K PACK HV

Page 1: ...2020 Soluna Australia Pty Ltd Page 1 of 25 Published date November 2020 Installation Manual Lithium Battery Pack SOLUNA 15K Pack HV Suitable for indoor installation Soluna Australia Pty Ltd ACN 634 9...

Page 2: ...fo soluna com au The information included in this manual is accurate at the time of publication However with respect to product design and technical specification updates Soluna Australia reserves the...

Page 3: ...BS 8 Packing list 9 Installation materials 9 Installation location 9 Installation tools 9 Outline dimensions mm 11 Technical data 12 Appearance 13 Wiring port 14 3 Installation________________________...

Page 4: ...hat battery polarity is observed and that the BS is connected correctly Keep the BS away from an open flame or sources of ignition Keep children and animals away from the BS Read the manual in its ent...

Page 5: ...ight 4 Do not allow the BS connectors to touch conductive objects such as wires Risks of electric shock 1 Do not disassemble the BS 2 Do not touch the BS with wet hands 3 Do not expose the BS to moist...

Page 6: ...the leaked substance 8 If ingestion does occur induce vomiting and seek medical attention immediately Fire Always keep an ABC or carbon dioxide fire extinguisher nearby in case of fire The BS may cat...

Page 7: ...ed installer only that is a trained and qualified electrician with the following skills and experience 1 Knowledge of the functional principles and operation of on grid systems 2 Knowledge of the dang...

Page 8: ...er temperature protection functions It is characterised by high energy density long life safety and reliability and is environmentally sustainable Features 1 Excellent safety performance 2 Long cycle...

Page 9: ...ire 1 Installation materials Installers should prepare the following installation materials 1 Charging cables 2 Network cables Installation location Ensure that the installation location meets the fol...

Page 10: ...2020 Item Photo Name 1 Phillips screwdriver bit 2 Network crimper 3 Wire cutter 4 Wire stripper 5 Tape measure All tools should be properly insulated to prevent an accidental electric shock or short c...

Page 11: ...tallation Manual 2020 Soluna Australia Pty Ltd Page 11 of 25 Published date November 2020 Outline dimensions mm Figure 2 1 outline dimensions Depth Width Width mm 654 2 Depth mm 227 2 Height mm 1205 3...

Page 12: ...rge current A 30 30 Charge discharge power nominal kW 6 Max charge discharge power kW 10 DoD 80 Cycle life 3600 Battery pack round trip efficiency 95 DC disconnect Contactor fuse BMS Power consumption...

Page 13: ...tion Manual 2020 Soluna Australia Pty Ltd Page 13 of 25 Published date November 2020 Appearance Figure 2 2 appearance Number Name Remark Cable entry Power ON OFF Upper handle Lower handle Grounding Gr...

Page 14: ...November 2020 Wiring port The wiring port of the Soluna 15K PACK HV can be seen once the cover cap has been opened see diagram below for details Figure 2 3 Wiring port Number Name Remark CAN1 port Fo...

Page 15: ...ce of 200 cm in all directions around the BS Position Minimum spacing cm Remark Side spacing 100 Allow clearance of at least 100 cm on either side of the BS Above 40 Nothing should be placed on top of...

Page 16: ...ring specification To standardise the BS wiring specification the following are required to connect the wires Battery wire Communication cable Use of an 8 AWG conductor with double insulation is recom...

Page 17: ...communication interface CAN 1 and CAN 2 Figure 3 1 CAN interface definition CAN 1 port for external communication 1 2 3 4 5 6 7 8 CAN 1H CAN 1L CAN 2 port for internal communication 1 2 3 4 5 6 7 8 CA...

Page 18: ...15K Pack HV Installation Manual 2020 Soluna Australia Pty Ltd Page 18 of 25 Published date November 2020 Electrical connection Please refer to the following for details Preparation...

Page 19: ...procedures Step 2 Create the power cables Crimp the connector OT6 5 Bind with insulating tape Step 1 Connect the earth cable ideally the earth terminal and cable should be fastened with an M6 screw Te...

Page 20: ...Page 20 of 25 Published date November 2020 Step 3 Lock power cables and communication cable Step 4 Lock the cover Remove communication cable from accessory box and plug in Lock power cable with a Phi...

Page 21: ...15K Pack HV Installation Manual 2020 Soluna Australia Pty Ltd Page 21 of 25 Published date November 2020...

Page 22: ...ation wire 2 Connect the inverter and the DC port of the BS with wires 3 Turn on the breaker on the right side of the BS 4 To shut down switch off the breaker 4 Consumer Start up and Shut down procedu...

Page 23: ...15K Pack HV Installation Manual 2020 Soluna Australia Pty Ltd Page 23 of 25 Published date November 2020...

Page 24: ...the username and password installer only if required 1 Turn on the power the power indicator will be lit 2 Plug one side of the CAN box into the CAN 2 port the other side into the laptop 3 Open the f...

Page 25: ...it enters a warning state When a warning is reported the inverter immediately ceases operation The monitoring software on the inverter can be used to identify the cause of the warning Possible warning...

Reviews: