
15K Pack HV Installation Manual
© 2020 Soluna Australia Pty Ltd
Page 20 of 25
Published date: November 2020
Step 3
. Lock power cables and communication cable.
Step
4
. Lock the cover.
Remove communication cable
from accessory box and plug in.
Lock power cable with a
Phillips screwdriver (M5).
Lock cover with a hexagon
wrench (2.5 mm)