15K Pack HV Installation Manual
© 2020 Soluna Australia Pty Ltd
Page 22 of 25
Published date: November 2020
Operating instructions
Please refer to the following for details.
1)
Connect the inverter and BS with communication wire.
2)
Connect the inverter and the DC port of the BS with wires.
3)
Turn on the breaker (on the right side of the BS).
4)
To shut down, switch off the breaker.
4.
Consumer ‘Start up’ and ‘Shut down’ procedure
1)
To turn on the BS, push the breaker up (the breaker is located on the right side of the BS:
see diagram above).
2)
To shut down the BS, push the breaker down.
Note:
CAN 1 is connected to the inverter for communication.