44
User Manual
MHT-4~20K series
5.5.9 Parallel System
For the general version, back-up cannot
connect in parallel. For advanced applications,
please contact our after-sales department.
Single PV string cannot connect to multiple
inverters.
Lo
Lo
ads
ads
Back
Back-up
-up
X
One meter cannot be connected to multiple
inverters. Different CTs cannot connect to the
same line cable.
One battery bank cannot be connected to
multiple inverters.
The on-grid and back-up side cannot be
connected to and generator directly.
For advanced applications, please contact our
after-sales department.
The back-up side cannot be connected on-
grid side or grid.
Grid
Back-up
On-grid
X
X
Mete
r
X
Gener
ator
Back-up
On-grid
Figure 5-27
For more installation and setup information about parallel system,
please contact Solinteg
.
NOTE
Summary of Contents for MHT-10K-25
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 88: ...www solinteg com M11 00001 01 ...