55
User Manual
MHT-4~20K series
Operation
7
When the inverter is turned on, the following interfaces will be displayed on the OLED
display, and the OLED display allows the user to check various operation information and
to modify the settings of the inverter.
If the parameter is a number short press to change the number, long
press to confirm the number and jump to the next number.
Please wait for 10 seconds and the inverter will automatically save your
settings or modifications.
NOTE
※
7.1 Main Window
Abbreviation
Complete Name
V-Ipv1/2
PV input voltage and current of each MPPT
Ppv1/2
PV input power of each MPPT
BAT Parameter
Battery Parameter
Charg.
Charge
Disch.
Discharge
V_L1: / V_L2: / V_L3:
Three-phase AC voltage (On-Grid status)
VbakL1: / VbakL2: / VbakL3:
Three-phase AC voltage (Off-Grid status)
I_L1: / I_L2: / I_L3:
Inverter output current (On-Grid status)
IbakL1: / IbakL2: / IbakL3:
Inverter output current (Off-Grid status)
FreqL1: / FreqL2: / FreqL3:
Inverter output Frequency (Off-Grid status)
FW Updating
Firmware Updating
Inverter Display Abbreviation and Complete Name Reference Table
No need to p
ress, ju
st wait
Lo
ng press(3s),e
nter the lower Menu
Wa
iting/Ch
ecki
ng/On-
-Grid/Faul
t
Info/F
W Updating
MHT-OLED-01-EN
1s
V-Ipv1
/2
600V
10A
500V
10A
500V
10A
Charg.
5kW
Frequency
50Hz
1s
1s
1s
Product
Model
General
Settings
1s
Advanced
Settings
1s
1s
1s
1s
Inve er working
status
Ppv1
/2
6000W
5000W
Wait
FreqL1
:4
9.99Hz
FreqL2
:4
9.99Hz
FreqL3
:4
9.99Hz
1s
1s
1s
O -Grids tatus
BAT Parameter
V_L1: 230V
V_L2: 230V
V_L3: 230V
I_L1: 10A
I_L2: 10A
I_L2: 10A
VbakL1: 230V
VbakL2: 230V
VbakL3: 230V
IbakL1: 10A
IbakL2: 10A
IbakL3: 10A
4
4
4
Summary of Contents for MHT-10K-25
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 88: ...www solinteg com M11 00001 01 ...