30
User Manual
MHT-4~20K series
※
5.2 AC Connection
5.2.1 AC Side Requirements
①
An independent AC breaker is required in both on-grid and back-up
output side, and any loads cannot be connected with inverter directly.
②
Before making the connection of AC cable, please confirm all DC &
AC power source are disconnected from the inverter.
③
The Solinteg MHT 4~20kW series three-phase high voltage hybrid
inverter applies to the three-phase power grid with a voltage of
230/400V and a frequency of 50/60Hz.
④
Connect the inverter to the grid only after getting an approval from
the local electric power company.
NOTICE
A three-phase AC breaker needs to be installed on the AC side of the MHT 4~20kW. To
ensure that the MHT 4~20kW can safely disconnect itself from the power grid when an
exception occurs, select a proper overcurrent protection device in compliance with local
power distribution regulations and Max. input (output) current of MHT 4~20kW AC side.
The allowable AC cable of wire diameter and cross-sectional area for Solinteg MHT 4~20kW
are as shown in the following:
Figure 5-4
Wir
e Diamete
r
13~18mm
Cross-sec
tional
Area
2.5~10mm
2
On-grid side uses a five-core cable (L1, L2, L3, N, and PE). Back-up side uses a four-core
cable (L1, L2, L3, N).
Determine whether an AC circuit breaker with greater overcurrent
capacity is required based on actual conditions.
NOTICE
Summary of Contents for MHT-10K-25
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 88: ...www solinteg com M11 00001 01 ...