Commissioning
6
※
6.1 App Preparation
①
Install the Setup App and Monitoring App with latest version. Refer to "8.2 Monitoring
APP and 8.3 Setup APP".
②
Register an account on Monitoring APP. If you have got the account and password from
the distributor/installer or Solinteg, skip this step.
※
6.2 Inspection Before Commissioning
Check the following items before starting the inverter:
①
All equipment has been reliably installed.
②
DC switch(es) and AC circuit breaker are in the "OFF" position.
③
The ground cable is properly and reliably connected.
④
The AC cable is properly and reliably connected.
⑤
The DC cable is properly and reliably connected.
⑥
The communication cable is properly and reliably connected.
⑦
The vacant terminals are sealed.
⑧
No foreign items, such as tools, are left on the top of the machine or in the junction box (if
there is).
⑨
The AC circuit breaker is selected in accordance with the requirements of this manual
and local standards.
⑩
All warning signs & labels are intact and legible.
※
6.3 Commissioning Procedure
If all of the items mentioned above meet the requirements, proceed as follows to start up
the inverter for the first time.
①
Turn on the AC breaker.
②
Turn on the lithium battery switch. Power on the battery pack manually if a battery is
equipped.
③
Turn the DC switch, the DC switch may be integrated in the inverter or installed by the
customer.
④
If the irradiation and grid conditions meet requirements, the inverter will normally
operate. The connection time for inverter to gird may take few minutes or even to more
according to different country code chosen in the initial settings and the real site grid
condition.
⑤
Observe the LED indicator to ensure that the inverter operates normally.