![SOLID AIR FDC25 Manual Download Page 21](http://html.mh-extra.com/html/solid-air/fdc25/fdc25_manual_1315332021.webp)
SOLID AIR ®
CLIMATE SOLUTIONS
•
T +31 598 36 12 21
•
www.solid-air.com
•
21
- 58
Product overview
Technical data
Ordering key
Installations
Accessories
Replacements
Maintenance and operation
The wall is composed of concrete blocks (minimum density of 550 kg/m³) or reinforced
concrete (minimum density of 2200 kg/m³) and with a minimum thickness of 100 mm.
Installation material is mineral wool, covered with plasterboard cover boards.
RIGID WALL
INSTALLATION
(MINERAL WOOL SEALING)
INSTALLATION
1. Create an opening in the wall (Ø d + 80 mm) x (Ø d + 80 mm). Bend the fixing bracket
(1)
90°. Place the damper in the opening up to the wall limit mark
(7)
on the damper.
Damper blade must be closed during the installation!
2. Fix the damper to the wall using screws. Bracket screw hole is 6 mm in diameter.
3. Fill the space between the damper and the wall with mineral wool
(3)
( ≥ 100 kg/m³).
Cover the mineral wool with GKF gypsum boards
(4)
(12.5 mm thick), and fix them with
screws.
*Multiple fire dampers can be installed next to each other or ceiling/wall with the mini-
mal distance of 30 mm between them. See
.
Test the operation of the damper blade!
1
4
3
7
625
625
> 440
625
625
> 440
1
2
3
>
>