Product overview
Technical data
Ordering key
Installations
Accessories
Replacements
Maintenance and operation
Material compliant with the classification from (D.o.P.),
Mineral wool 250 mm wide (140 kg/m³).
30
30
30
30
Ød/2
30
Minimal distances from another damper or wall/ceiling.
SAMENGESTELDE INSTALLATIE VAN
BRANDKLEPPEN
INSTALLATION
Damper blade must be closed during installation!
Weichschott/Fire Batt - mineral wool
1. *. Prepare opening in the wall according to the installation type. (Weichschott/Firebatt
installation- build the subframe according to the drawing
.
Mortar- Gypsum blocks
1. Prepare opening in the wall according to the
.
Fire damper can be installed with
minimal distance of 30 mm between wall/ceiling and 30 mm from other dampers.
2. Insert the fire dampers into the wall and fill the space between the casings with mine-
ral wool (140 kg/m³) up to flanges. Fill the space between the wall/ceiling with mineral
wool (140 kg/m³) up to flanges.
3.
Fill the rest of the wall openings according to the type of installation in the (D.o.P.).
4. Complete the installation according to the (D.o.P.).
Test the operation of the damper blade!
>
>