Transport, handing and storage
Solé, S.A. C-243 b, km 2 · 08760 Martorell (Barcelona) ·Tel. +34 93 775 14 00 · www.solediesel.com · [email protected]
14
Operator’s Manual
. Marine generator sets
2.3. Transporting and Handling the Unpacked Genset
When the genset is unpacked and ready for transport, use EXCLUSIVELY the appropriate lifting
eyebolts.
2.4. Storage of Packed and Unpacked Genset
If the genset is left idle for prolonged periods, the client must check the possible conditions of
conservation in relation to the place of storage.
If the genset is unused for prolonged periods and stored, observe all the relative technical
specifications.
The treatment of the genset for storage is guaranteed for 6 months after the time of delivery.
If the user decides to start the genset after a long-time period, this must be done in the
presence of an authorized technic.
For gensets 8 GTC / 10 GTAC / 7 GSC / 8 GSAC
For gensets 11GTC / 14GTAC / 10 GSC / 12 GSAC
/ 17 GTC / 20 GTAC / 14 GSC / 17 GSAC