46
© Solarbayer GmbH [02.16]
PRODUCT INFORMATION
Wood log boiler HVS
Main
tenance
Combustion chamber
Fireclay bricks:
the heat resistant fireclay bricks are loosely placed in the steel tub, as shown in the picture. If the fireclay bricks
are arranged incorrectly , the flame may hit the steel tub unhindered and therefore the tub might be destroyed
ahead of time.
Push up the steel tub to the back wall of the boiler and never operate
it without the fireclay bricks.
The fireclay bricks have to overlap the front edge of the steel tub approx. 20 mm.
Steel tub (replaceable):
A deformation or an erosive burning of the steel tub do not affect the furnace capacity and are not a defect. This is
a normal process.
HVS 16 LC
HVS 25 E and HVS 25 LC
5 fireclay bricks
HVS 40 E
HVS 40 LC
8 fireclay bricks
HVS 60 E
HVS 60 LC
9 fireclay bricks
HVS 100 E
HVS 100 LC
13 fireclay bricks
Catalyzer bricks
(only HVS 25 E and HVS 25 LC)
:
Both catalyzer bricks (those are identical to the fireclay plates) have to be placed, as displayed below, in the upper
retaining ledges of the combustion chamber. Thus, the bricks stand on the fireclay plates and are fixed by the
retaining ledges from above.
catalyzer
brick
catalyzer
brick
catalyzer bricks
retaining ledges
view from above
front view
Summary of Contents for HVS 100 E
Page 13: ... Solarbayer GmbH 02 16 13 PRODUCT INFORMATION Wood log boiler HVS Installation Installation ...
Page 25: ... Solarbayer GmbH 02 16 25 PRODUCT INFORMATION Wood log boiler HVS Operation Operation ...
Page 41: ... Solarbayer GmbH 02 16 41 PRODUCT INFORMATION Wood log boiler HVS Maintenance Maintenance ...