48
© Solarbayer GmbH [02.16]
PRODUCT INFORMATION
Wood log boiler HVS
Main
tenance
primary air
duct
secondary air duct
Primary and secondary air duct
After having removed the assembly group the way to the pipes of the primary and secondary air is cleared. The
secondary air ducts lead combustion air towards the nozzle’s lateral boreholes. The primary air duct leads the air
over the ducts into the fuel chamber.
primary air duct
The primary air ducts of the HVS 16, HVS 25 and
HVS 40 are placed on the side (2 on each side, left and
right)
The primary air steadily pours into the fuel chamber
ober the air ducts.
primary air
duct
The primary air ducts of the HVS 60 and HVS 100 are
placed on the back (2 ducts)
Summary of Contents for HVS 100 E
Page 13: ... Solarbayer GmbH 02 16 13 PRODUCT INFORMATION Wood log boiler HVS Installation Installation ...
Page 25: ... Solarbayer GmbH 02 16 25 PRODUCT INFORMATION Wood log boiler HVS Operation Operation ...
Page 41: ... Solarbayer GmbH 02 16 41 PRODUCT INFORMATION Wood log boiler HVS Maintenance Maintenance ...