|
7
February 2020
|
Solar Stik
®
, Inc.
System Setup and Operation Manual for ATSC MS3 L0
List of Figures
Figure 1. MS3 L0 HPS ...................................................................................................................................................... 9
Figure 2. PRO-Verter grounding lug ............................................................................................................................... 13
Figure 3. Hybrid Power System in Operation ................................................................................................................. 20
Figure 4. Example-Stacking PRO-Verters ..................................................................................................................... 21
Figure 5. Example-Stacking Power Hubs ...................................................................................................................... 22
Figure 6. Connecting Li Expander Paks using Inter-Connect Strips and Inter-Connect Cables .................................... 22
Figure 7. Inter-Connect Plug .......................................................................................................................................... 24
Figure 8. System connection color coding ..................................................................................................................... 25
Figure 9. System Setup Guide on the PRO-Verter I-Plate .............................................................................................. 27
Figure 10. System connection diagram .......................................................................................................................... 27
Figure 11. Solar Array transport case contents packed (left) and unpacked (right) ....................................................... 28
Figure 12. Working-space distance for the Solar Arrays, Power Hub, and the trailer .................................................... 29
Figure 14. PRO-Verter to Expander Pak connections .................................................................................................... 30
Figure 13. PRO-Verter to generator connections ........................................................................................................... 30
Figure 15. PRO-Verter to shelter service panel connection ........................................................................................... 31
Figure 16. Connect negative and positive ends of the cables as shown ....................................................................... 31
Figure 17. Solar Array to Power Hub connections ......................................................................................................... 32
Figure 19. PRO-Verter to Power Hub connection .......................................................................................................... 32
Figure 18. Power Hub air intake port and vent filter ....................................................................................................... 32
Figure 20. RMK external communication ....................................................................................................................... 33
Figure 21. PRO-Verter grounding lug ............................................................................................................................. 33
Figure 22. Generator control panel ................................................................................................................................. 34
Figure 23. PRO-Verter LCD control panel ...................................................................................................................... 34
Figure 24. Generator Status LEDs .................................................................................................................................. 35
Figure 25. Back, Next, and Select buttons ..................................................................................................................... 46
Figure 26. Power Hub User Interface ............................................................................................................................. 47
Figure 27. Hybrid Power System bypass connection .................................................................................................... 52
Figure 28. 24VDC Li Expander Pak 2400 ....................................................................................................................... 80
Figure 29. PRO-Verter temperature reports from the user interface .............................................................................. 86
Figure 30. Lock Securing the Lid of the Power Hub 2400 ............................................................................................ 90
Figure 31. Fastener locations on vent shroud (upgraded/new version) ......................................................................... 97
Figure 32. Removed vent shroud to access the louvered vent cover ............................................................................ 97
Figure 33. Replacing PRO-Verter filter (left); cleaning a PRO-Verter filter (right) ............................................................ 98
Figure 34. Removing the Power Hub air intake vent filter for cleaning .......................................................................... 99
Figure 35. View Charge Unit Status submenu navigation ............................................................................................ 103
Figure 36. Procedure to measure PAM Voc .................................................................................................................. 104
Figure 37. Procedure to measure PAM quarter panel Voc .......................................................................................... 104