|
35
February 2020
|
Solar Stik
®
, Inc.
System Setup and Operation Manual for ATSC MS3 L0
C System Initialization and Calibration
1. Set the PRO-Verter clock. Rotate the SELECT knob. Press SELECT until local time is
programmed.
2. Test the PRO-Verter and generator operation
The Generator Status LED (Figure 16, left side) will be illuminated green.
a. Press the CTRL button (Figure 23). Rotate the SELECT knob to “03 Gen Control”. Press
SELECT.
b. Rotate the SELECT knob until “Generator ON” appears on the LCD. Press SELECT.
c. Press the CTRL button. Rotate the SELECT knob to “03 Gen Control”. Press SELECT.
d. Rotate the SELECT knob until “Generator AUTO” appears on the LCD. Press SELECT.
i. The “Remote Generator Start and Operation” sequence will begin (total process may
take 3 minutes).
Note:
The audible “Start-Warning” alarm will sound when the PRO-Verter is connected
to a generator. The alarm will last for 10 seconds before the motor cranks. During this
time, the Generator Status LED on the right will blink green indicating that the AGS
function is initiating the generator start sequence.
ii. Once the generator is operating, verify the “AC IN” LED illuminates and the LCD
displays CHARGE MODE within 90 seconds. At this point, the Generator Status LED on
the right will be solid green*.
iii. Verify the generator stays operating for 5 minutes uninterrupted while the CHARGE
mode is operating (LED next to CHG will be illuminated).
* If the Generator Status LED on the right is solid red, it Indicates a fault condition in which the
generator either has not started, or has not provided the correct Gen Run sense signal/voltage to
the AGS module – after four start attempts.
Initialization Complete
The generator will run until the batteries achieve full charge and then auto-stop. Normal cycling
will begin with the generator operating only as necessary for continuity of operation (keeping the
batteries charged and the load functioning).
Figure 24. Generator Status LEDs
Note:
AGS function can be tested by pressing the red “PUSH TO TEST” button above the
status light on the right. This may be useful if communication with the generator cannot be
accomplished using the normal, programmed method.