February 2020
|
Solar Stik
®
, Inc.
88
|
System Setup and Operation Manual for ATSC MS3 L0
MAINTENANCE INSTRUCTIONS
HPS Preventive Care and Maintenance
Follow these procedures to maintain the System.
• Shade the components (except the PV arrays) from direct sun exposure and shelter them
from the elements
• Follow the Expander Pak preventive maintenance checks and services listed in the Expander
Pak Operator Manual.
• Clean air filters of the PRO-Verter and Power Hub air intake vents once a month or more
frequently as warranted to minimize the accumulation of internal heat. See the component
manual for air filter cleaning instructions.
• Follow the generator maintenance procedures listed in the generator operator and maintenance
manual.
• Keep component case lids and Inter-Connect covers closed to prevent water/dust intrusion.
• Ensure the panels of the PV arrays are clean and positioned for maximum daily sunlight
exposure.
• Ensure the Solar Cables are secured.
• Check the integrity of electrical connectors and communication contacts on a monthly basis.
• Turn off electrical appliances when they are not in use to save power and allow more power to be
available when needed.