![Solar Stik ATSC MS3 L0 Setup And Operation Manual Download Page 28](http://html1.mh-extra.com/html/solar-stik/atsc-ms3-l0/atsc-ms3-l0_setup-and-operation-manual_1313503028.webp)
February 2020
|
Solar Stik
®
, Inc.
28
|
System Setup and Operation Manual for ATSC MS3 L0
A System Setup
OPERATOR INSTRUCTIONS
2 Remove Solar Arrays, Power Hub, and 20’ Inter-Connect Cable
from trailer
Remove the following components from the trailer:
• One (1) 24VDC Power Hub 2400
• Three (3) 420W Expedition Solar Array-C transport cases
• One (1) 20’ Inter-Connect Cable, located inside of the L0 Cable Transport Case
420W Expedition Solar Array-C Kit Inventory
o
Four (4) 105 W Photovoltaic (PV) Panels
o
One (1) Transport Case
o
One (1) Rollable Stand
o
Twelve (12) Sandbags
o
Ten (10) Stakes
o
One (1) 30’ Solar Leash
1
3
5
6
3 Inventory 420W Expedition Solar Array-C kit
Inventory the contents of each of the three (3) Solar Array transport cases prior to their deployment.
1
4
3
2
6
1
2
3
4
5
6
Figure 11. Solar Array transport case contents packed (left) and unpacked (right)
4
1 Inventory System components
Inventory the System components using the list in the
section.