10
IOMMASGPXX01-GB_01
10-40 kVA
UNPACKING AND INSTALLATION
OF THE UNIT
3
3.2.2-6
Loosen screws
B
.
Remove screws
C
.
3.2.2-7
Tighten screws
B
.
1
B
2
C
2
B
1
1
The UPS can be moved.
Place the UPS in the installation
area.
3.2.2-8
Secure the UPS with feet
D
.
D
D
Secure the UPS with feet
D
only when it is in position
with the cable connected.
Loosen screws
B
.
1
B
2
2
3.2.2-9
3.2.2-4
1
3
2
3.2.2-5
Remove screws
A
.
1
A
2
3.2.2 Models “T” (h 1.400 mm).
3.2.2-2
3.2.2-1
3.2.2-3
Remove screws
A
and screws
B
.
A
B