2.5 Mast Assembly (Figure 2-6,2-7)
Disassembly
Using a suitable lifting device, lower the work platform
into a horizontal position (Figure 2-5). If possible, place
the machine onto a sturdy work table using a forklift.
Never attempt to lower lift into a horizontal
position without the use of a suitable lifting
device; bodily injury or damage to the
machine may result.
NOTE: Mark all components as they are removed so
they can be reinstalled in the correct sequence and
location.
Platform Assembly Removal
(Figure 2-6)
1. Extend elevating assembly far enough to expose the
eight screws attaching the cage support assembly to
stage 6 by opening the emergency lowering valve and
pulling on the cage guardrail.
2. Remove cover from front of platform assembly.
3. Remove cotter pins, and drive out chain retaining pins
from the top front of stage 5.
4. Loosen screws from strap retainer on stage 5 top
casting. Pull strap free of retainer.
5. Remove cage support screws, slide the cage support
out of the sixth stage mast and set aside. It should not
be necessary to remove the pinch sheild. Be careful
not to damage the control cable.
Note: to remove the platform assembly from the cage
support assembly, follow steps 6-10 below.
6. Remove cable sheaves from cage support weldment,
and strain reliefs from stage 5 top casting.
7. Loosen screws from strap retainer on platform assem-
bly weldment and free strap from retainer.
8. Remove two screws and washers holding stop bracket
located at top of platform assembly weldment. Re-
move the stop bracket.
9. Slide the cage support weldment out of the top of the
platform assembly weldment.
10. Slide bearings in platform assembly may now be
inspected / replaced if necessary.
#6 Mast
1. Remove sequence strap retainer on the top of #4 mast.
2. Remove the Allen head screws holding the top mast
bearings between the #5 and #6 mast. Remove the top
mast bearings.
3. Slide #6 mast out of #5 mast. As mast is removed, the
bottom four mast bearings will fall out; note their
orientation for re-assembly.
4. Disconnect chain from top of #4 mast.
#5 Mast
1. Remove sequence strap retainer on the top of #3 mast.
2. Remove the Allen head screws holding the top mast
bearings between the #4 and #5 mast. Remove the top
mast bearings.
3. Slide #5 mast out of #4 mast. As mast is removed, the
bottom four mast bearings will fall out; note their
orientation for re-assembly.
4. Disconnect chain from top of #3 mast.
#4 Mast
1. Remove sequence strap retainer on the top of #2 mast.
2. Remove the Allen head screws holding the top mast
bearings between the #3 and #4 mast. Remove the top
mast bearings.
3. Slide #4 mast out of #3 mast. As mast is removed, the
bottom four mast bearings will fall out; note their
orientation for re-assembly.
Figure 2-5: Lifting/Lowering UL Lift
2.5
Forklift
Summary of Contents for UL25
Page 1: ...Ansi Part Number 511128 1 0 2 MAY 2013 Serial Number 21691 060000 PARTS SERVICE MANUAL...
Page 2: ......
Page 22: ...Daily Preventative Maintenance Checklist Operation Manual Page 15 NOTES...
Page 47: ...3 6 UL 25 32 40 Portable Personnel Lifts Troubleshooting Section 3 1 NOTES...
Page 54: ...5 3 ULII Series Parts Manual...
Page 56: ...5 5 ULII Series Parts Manual Drawing 1 of 2...
Page 57: ...5 6 ULII Series Parts Manual Drawing 2 of 2...
Page 58: ...5 7 ULII Series Parts Manual AC Power Option 068008 011 020809 001 FITTING TEE 6MJ 6MB 6FJX...
Page 59: ...5 8 ULII Series Parts Manual...
Page 60: ...5 9 ULII Series Parts Manual DC Power Option 068009 011...
Page 61: ...ULII Series Parts Manual 5 10...
Page 62: ...5 11 ULII Series Parts Manual AC Control Box 068007 021...
Page 63: ...5 12 ULII Series Parts Manual...
Page 64: ...5 13 ULII Series Parts Manual DC Control Box 068007 023...
Page 65: ...Page 15 ULII Series Parts Manual...
Page 66: ...Page 16 ULII Series Parts Manual Lift Cylinder UL25 068074 020 UL32 068074 021 UL40 068074 022...
Page 67: ...Page 17 ULII Series Parts Manual...
Page 73: ...Page 23 ULII Series Parts Manual NOTES...
Page 75: ...Page 25 ULII Series Parts Manual...
Page 77: ...Page 27 ULII Series Parts Manual...
Page 79: ...Page 29 ULII Series Parts Manual ILLUSTRATION OF CE CAGE...
Page 80: ...Page 30 ULII Series Parts Manual Loader Assembly UL25 068194 000...
Page 81: ...Page 31 ULII Series Parts Manual NOTES...
Page 82: ...Page 32 ULII Series Parts Manual Tilt Back Assembly UL32 068200 000...
Page 83: ...Page 33 ULII Series Parts Manual...
Page 84: ...Page 34 ULII Series Parts Manual Tilt Back Assembly UL40 068200 001...
Page 85: ...Page 35 ULII Series Parts Manual...
Page 86: ...Page 36 ULII Series Parts Manual Loader Stop Bracket Assembly 068190 000 Drawing...
Page 87: ...Page 37 ULII Series Parts Manual Loader Bar Assembly 068186 000...
Page 89: ...Page 39 ULII Series Parts Manual...
Page 90: ...Page 40 ULII Series Parts Manual Power Pack Option 068100 001...
Page 91: ...Page 41 ULII Series Parts Manual Electrical Schematic AC 068010 000...
Page 92: ...Page 42 ULII Series Parts Manual Electrical Schematic DC 068010 001...
Page 93: ...Page 43 ULII Series Parts Manual Hydraulic Schematic 068011 002...