CYLINDER REMOVAL (Figure 2-9)
Using a suitable lifting device, lower the work platform
into a horizontal position (Figure 2-5). If possible, place
the machine onto a sturdy work table using a forklift.
Never attempt to lower lift into a horizontal
position without the use of a suitable lifting
device; bodily injury or damage to the
machine may result.
1. Remove cylinder mounting plate fasteners and retain-
ing ring.
2. Remove tie rod nuts, count the number of turns
required to bring the nut flush with the tie rod end and
record for reference during installation. The tension
on the tie rods maintains the left / right positioning of
the cylinder within the mast assembly, reinstalling the
nuts with the proper tension will speed up adjustment
later.
3. Remove the cylinder mounting plate. Be careful not
to allow the tie rods to suck back inside of the mast
assembly, replace the nuts on the tie rod ends tempo-
rarily to prevent this.
4. Remove hydraulic line from the cylinder fitting and
cap the cylinder fitting to prevent contaminants from
entering the cylinder.
5. Remove sequence strap retainers on the top of #3 and
#2 masts.
6. Remove front and rear mast access plates from the
bottom of the #1 mast.
7. Remove the screws and washers, attaching the #2 and
#3 bottom castings to the #2 and #3 mast assemblies.
8. While keeping tension on the tie rods, slide the
cylinder and #2 and #3 bottom castings out the bottom
of the UL Lift far enough to expose both castings.
9. Install cylinder Tensioner Brackets, 062739-000 on #2
and #3 bottom castings. Remove tie rod nuts and
install the Tie Rod Tensioners, 062738-000. Remove
all slack from the chains with the Tie Rod Tensioners.
10. Remove cylinder assembly from mast assembly.
INSTALLATION
NOTE: Cylinder assembly must have Tension Brack-
ets, Tensioner Spacer and Tie Rod Tensioners installed
to remove slack from chain.
1. Slide cylinder assembly into mast assembly until #3
bottom casting is at the bottom of the mast assembly.
2. Install the screws and washers attaching the #3 bottom
casting to the #3 mast assemby.
3. Remove cylinder Tensioner Brackets from #2 and #3
bottom castings and Tie Rod Tensioners from tie rods.
Install tie rod nuts finger tight.
4. While maintaining tension on the tie rods to keep slack
out of the chains, slide cylinder assembly completely
into the mast assembly.
5. Install the screws and washers attaching the #2 bottom
casting to the #2 mast assembly.
6. Install front and rear mast cover plates on the bottom
of #1 mast.
7. Fish #4 strap between #3 and #2 mast with fish tape.
8. Slide #4 strap through #2 casting.
9. Fish #3 strap between #2 and #1 mast with fish tape.
10. Install strap #4 to #2 top casting.
11. Install strap #3 to #1 top casting.
12. While maintaining tension on the sequencing straps,
install strap retainers using Loctite
®
242 or equivalent
on the threads of the retainer screws.
13. Reconnect hydraulic line.
14. Remove nuts from tie rod ends and set the cylinder
mounting plate into place. Secure mounting plate with
fasteners.
15. Install tie rod nuts flush with tie rod ends, torque each
nut the exact number of turns used to remove it.
16. Reinstall retaining ring.
Figure 2-9: Cylinder Assembly Installation
1
2
3
5
4
6
4.Bottom Casting, Mast #2
5.Bottom Casting, Mast #3
6.Cylinder
1.Tensioner Bracket (062739-000)
2.Tie Rod Tensioners (0 62738-000)
3.Tie Rods
Summary of Contents for UL25
Page 1: ...Ansi Part Number 511128 1 0 2 MAY 2013 Serial Number 21691 060000 PARTS SERVICE MANUAL...
Page 2: ......
Page 22: ...Daily Preventative Maintenance Checklist Operation Manual Page 15 NOTES...
Page 47: ...3 6 UL 25 32 40 Portable Personnel Lifts Troubleshooting Section 3 1 NOTES...
Page 54: ...5 3 ULII Series Parts Manual...
Page 56: ...5 5 ULII Series Parts Manual Drawing 1 of 2...
Page 57: ...5 6 ULII Series Parts Manual Drawing 2 of 2...
Page 58: ...5 7 ULII Series Parts Manual AC Power Option 068008 011 020809 001 FITTING TEE 6MJ 6MB 6FJX...
Page 59: ...5 8 ULII Series Parts Manual...
Page 60: ...5 9 ULII Series Parts Manual DC Power Option 068009 011...
Page 61: ...ULII Series Parts Manual 5 10...
Page 62: ...5 11 ULII Series Parts Manual AC Control Box 068007 021...
Page 63: ...5 12 ULII Series Parts Manual...
Page 64: ...5 13 ULII Series Parts Manual DC Control Box 068007 023...
Page 65: ...Page 15 ULII Series Parts Manual...
Page 66: ...Page 16 ULII Series Parts Manual Lift Cylinder UL25 068074 020 UL32 068074 021 UL40 068074 022...
Page 67: ...Page 17 ULII Series Parts Manual...
Page 73: ...Page 23 ULII Series Parts Manual NOTES...
Page 75: ...Page 25 ULII Series Parts Manual...
Page 77: ...Page 27 ULII Series Parts Manual...
Page 79: ...Page 29 ULII Series Parts Manual ILLUSTRATION OF CE CAGE...
Page 80: ...Page 30 ULII Series Parts Manual Loader Assembly UL25 068194 000...
Page 81: ...Page 31 ULII Series Parts Manual NOTES...
Page 82: ...Page 32 ULII Series Parts Manual Tilt Back Assembly UL32 068200 000...
Page 83: ...Page 33 ULII Series Parts Manual...
Page 84: ...Page 34 ULII Series Parts Manual Tilt Back Assembly UL40 068200 001...
Page 85: ...Page 35 ULII Series Parts Manual...
Page 86: ...Page 36 ULII Series Parts Manual Loader Stop Bracket Assembly 068190 000 Drawing...
Page 87: ...Page 37 ULII Series Parts Manual Loader Bar Assembly 068186 000...
Page 89: ...Page 39 ULII Series Parts Manual...
Page 90: ...Page 40 ULII Series Parts Manual Power Pack Option 068100 001...
Page 91: ...Page 41 ULII Series Parts Manual Electrical Schematic AC 068010 000...
Page 92: ...Page 42 ULII Series Parts Manual Electrical Schematic DC 068010 001...
Page 93: ...Page 43 ULII Series Parts Manual Hydraulic Schematic 068011 002...