UL-25/32/40 Portable Personnel Lifts
2-9
Maintenance
Section
2.5
#4 Mast
1. Set #4 mast in place with the sequencing strap inside
and the chains on the bottom.
2. Install bottom lower bearings.
3. Install bottom upper bearings.
4. Slide mast #4 in, make sure chains are not twisted.
5. Install top bearings and secure with retaining screws
using Loctite
®
242 or equivalent on the threads.
6. Install chains around #3 sheave and down through #3
casting, secure to #2 casting with new roll pins.
7. Use a center punch to dimple pin hole after roll pins
are installed.
#5 Mast
1. Set #5 mast in place with the sequencing strap inside.
2. Install bottom lower bearings.
3. Install bottom upper bearings.
4. Slide #5 mast in, make sure chains are not twisted.
5. Install top bearings and secure with retaining screws
using Loctite
®
242 or equivalent on the threads.
6. Install chains around #4 sheaves and down through #4
casting, secure to #3 casting with new roll pins.
7. Use a center punch to dimple pin holes after all roll
pins are installed.
8. Slide mast in, leaving 25 cm (10") exposed.
#6 Mast
1. Set #6 mast in place with the sequencing strap inside.
2. Run the remaining sequencing strap (from platform
assembly) through the slot in the bottom of stage #6
and up through the inside. Leave just enough slack on
the outside to reach the attachment point at the top of
stage #5.
3. Install bottom lower bearings.
4. Install bottom upper bearings.
5. Slide #6 mast in, make sure chains are not twisted.
6. Install top bearings and secure with retaining screws
using Loctite
®
242 or equivalent on the threads.
7. Install #6 chain around #5 sheave and through casting,
secure to #4 casting with new roll pins.
8. Use a center punch to dimple pin holes after all roll
pins are installed.
9. Pull the sequencing strap attached to the bottom of
mast #6 out through the bottom of the mast assembly.
Be sure not to pull the strap that is attached to the top
of mast #5.
2.5 Mast Assembly (Cont.)
4. Disconnect chain from top of #2 mast.
5. Remove cylinder by following instructions in
Section 2.7
.
#3 Mast
1. Remove sequence strap retainer on the top of #1 mast.
2. Remove the Allen head screws holding the top mast
bearings between the #2 and #3 mast. Remove the top
mast bearings.
3. Slide #3 mast out of #2 mast. As mast is removed, the
bottom four mast bearings will fall out; note their
orientation for re-assembly.
#2 Mast
1. Remove the Allen head screws holding the top mast
bearings between the #1 and #2 mast. Remove the top
mast bearings.
2. Slide #2 mast out of #1 mast. As mast is removed, the
bottom four mast bearings will fall out; note their
orientation for re-assembly.
ASSEMBLY (Figure 2-7)
Note: Use WD-40 lubricant as necessary to aid in
reassembly.
#2 Mast
1. Set #2 mast in place.
2. Install bottom lower bearings.
3. Install bottom upper bearings.
4. Slide #2 mast in all the way except 30 -38 cm (12-15").
5. Install top bearings and secure with retaining screws
using Loctite
®
242 or equivalent on the threads.
6. Slide #2 mast in completely.
#3 Mast
1. Set #3 mast in place with the sequencing strap inside.
2. Install bottom lower bearings.
3. Install bottom upper bearings.
4. Slide #3 mast in all the way except 30 -38 cm (12-15").
5. Install top bearings and secure with retaining screws
using Loctite
®
242 or equivalent on the threads.
6. Place a 10" (25 cm) long wood block between #3 and
#2 masts, slide #3 mast down tight against block. Pull
sequencing strap completely out of the bottom of
assembly.
7. Install cylinder assembly by following instructions in
section 2.6.
2.5
Summary of Contents for UL25
Page 1: ...Ansi Part Number 511128 1 0 2 MAY 2013 Serial Number 21691 060000 PARTS SERVICE MANUAL...
Page 2: ......
Page 22: ...Daily Preventative Maintenance Checklist Operation Manual Page 15 NOTES...
Page 47: ...3 6 UL 25 32 40 Portable Personnel Lifts Troubleshooting Section 3 1 NOTES...
Page 54: ...5 3 ULII Series Parts Manual...
Page 56: ...5 5 ULII Series Parts Manual Drawing 1 of 2...
Page 57: ...5 6 ULII Series Parts Manual Drawing 2 of 2...
Page 58: ...5 7 ULII Series Parts Manual AC Power Option 068008 011 020809 001 FITTING TEE 6MJ 6MB 6FJX...
Page 59: ...5 8 ULII Series Parts Manual...
Page 60: ...5 9 ULII Series Parts Manual DC Power Option 068009 011...
Page 61: ...ULII Series Parts Manual 5 10...
Page 62: ...5 11 ULII Series Parts Manual AC Control Box 068007 021...
Page 63: ...5 12 ULII Series Parts Manual...
Page 64: ...5 13 ULII Series Parts Manual DC Control Box 068007 023...
Page 65: ...Page 15 ULII Series Parts Manual...
Page 66: ...Page 16 ULII Series Parts Manual Lift Cylinder UL25 068074 020 UL32 068074 021 UL40 068074 022...
Page 67: ...Page 17 ULII Series Parts Manual...
Page 73: ...Page 23 ULII Series Parts Manual NOTES...
Page 75: ...Page 25 ULII Series Parts Manual...
Page 77: ...Page 27 ULII Series Parts Manual...
Page 79: ...Page 29 ULII Series Parts Manual ILLUSTRATION OF CE CAGE...
Page 80: ...Page 30 ULII Series Parts Manual Loader Assembly UL25 068194 000...
Page 81: ...Page 31 ULII Series Parts Manual NOTES...
Page 82: ...Page 32 ULII Series Parts Manual Tilt Back Assembly UL32 068200 000...
Page 83: ...Page 33 ULII Series Parts Manual...
Page 84: ...Page 34 ULII Series Parts Manual Tilt Back Assembly UL40 068200 001...
Page 85: ...Page 35 ULII Series Parts Manual...
Page 86: ...Page 36 ULII Series Parts Manual Loader Stop Bracket Assembly 068190 000 Drawing...
Page 87: ...Page 37 ULII Series Parts Manual Loader Bar Assembly 068186 000...
Page 89: ...Page 39 ULII Series Parts Manual...
Page 90: ...Page 40 ULII Series Parts Manual Power Pack Option 068100 001...
Page 91: ...Page 41 ULII Series Parts Manual Electrical Schematic AC 068010 000...
Page 92: ...Page 42 ULII Series Parts Manual Electrical Schematic DC 068010 001...
Page 93: ...Page 43 ULII Series Parts Manual Hydraulic Schematic 068011 002...