Page 1
O
PERATION
M
ANUAL
WARNING
All personnel shall carefully read, understand and follow all safety rules and operating
instructions before operating or performing maintenance on any Snorkel aerial work platform.
THIS MACHINE IS FOR INDOOR USE ONLY!
Do not use out of doors.
USE OF THE AERIAL WORK PLATFORM
: This aerial work platform is intended to lift persons and his tools as well as the material
used for the job. It is designed for repair and assembly jobs and assignments at overhead workplaces (ceilings, cranes, roof structures,
buildings etc.). All other uses of the aerial work platform are prohibited!
THIS AERIAL WORK PLATFORM IS NOT INSULATED!
For this reason it is imperative to keep a safe distance from live parts of elec-
trical equipment! DO NOT get closer than the minimum distance recommended by the “National Regulations”.
Exceeding the specified permissible maximum load
is prohibited!
See “Special Limitations” on page 4 for details.
The use and operation of the aerial work platform as a lifting tool or a crane (lifting of loads from below upwards or from up high on
down)
is prohibited!
NEVER
exceed the manual force allowed for this machine.
See “Special Limitations” on page 4 for details.
DISTRIBUTE
all platform loads evenly on the platform.
NEVER
operate the machine without first surveying the work area for surface hazards such as holes, drop-offs, bumps, curbs, or debris;
and avoiding them.
OPERATE
machine only on surfaces capable of supporting outriggers.
IN CASE OF EMERGENCY
push EMERGENCY STOP switch to deactivate all powered functions.
Climbing up the railing of the platform, standing on or stepping from the platform onto buildings, steel or prefab concrete structures, etc.,
is prohibited!
Dismantling the entry gate or other railing components
is prohibited!
Always make certain that the entry gate is closed and securely
locked!
It is prohibited
to keep the entry gate in an open position (held open with tie-straps) when the platform is raised!
To extend the height or the range by placing of ladders, scaffolds or similar devices on the platform
is prohibited!
NEVER
perform service on machine while platform is elevated without blocking elevating assembly.
INSPECT
the machine thoroughly for cracked welds, loose or missing hardware, hydraulic leaks, loose wire connections, and damaged
cables or hoses before using.
VERIFY
that all labels are in place and legible before using.
NEVER
use a machine that is damaged, not functioning properly, or has damaged or missing labels.
To bypass any safety equipment
is prohibited
and presents a danger for the persons on the aerial work platform and in its working
range.
NEVER
charge batteries near sparks or open flame. Charging batteries emit explosive hydrogen gas.
Modifications to the aerial work platform
are prohibited
or permissible only at the approval by
Snorkel
.
AFTER USE
, secure the work platform from unauthorized use by turning keyswitches off and removing key.
NEVER
climb, stand,
or sit on platform
guardrails or midrail.
NEVER
position the
platform without first
checking for overhead
obstructions or other
hazards.
THIS MACHINE IS
NOT INSULATED!
NEVER
elevate the
platform unless all
four (4) outriggers
have been properly
installed.
NEVER
elevate the
platform without first
leveling the base.
NEVER
attempt to
push the
Snorkel
Lift
with people or
materials on the
platform or with the
platform elevated.
Summary of Contents for UL25
Page 1: ...Ansi Part Number 511128 1 0 2 MAY 2013 Serial Number 21691 060000 PARTS SERVICE MANUAL...
Page 2: ......
Page 22: ...Daily Preventative Maintenance Checklist Operation Manual Page 15 NOTES...
Page 47: ...3 6 UL 25 32 40 Portable Personnel Lifts Troubleshooting Section 3 1 NOTES...
Page 54: ...5 3 ULII Series Parts Manual...
Page 56: ...5 5 ULII Series Parts Manual Drawing 1 of 2...
Page 57: ...5 6 ULII Series Parts Manual Drawing 2 of 2...
Page 58: ...5 7 ULII Series Parts Manual AC Power Option 068008 011 020809 001 FITTING TEE 6MJ 6MB 6FJX...
Page 59: ...5 8 ULII Series Parts Manual...
Page 60: ...5 9 ULII Series Parts Manual DC Power Option 068009 011...
Page 61: ...ULII Series Parts Manual 5 10...
Page 62: ...5 11 ULII Series Parts Manual AC Control Box 068007 021...
Page 63: ...5 12 ULII Series Parts Manual...
Page 64: ...5 13 ULII Series Parts Manual DC Control Box 068007 023...
Page 65: ...Page 15 ULII Series Parts Manual...
Page 66: ...Page 16 ULII Series Parts Manual Lift Cylinder UL25 068074 020 UL32 068074 021 UL40 068074 022...
Page 67: ...Page 17 ULII Series Parts Manual...
Page 73: ...Page 23 ULII Series Parts Manual NOTES...
Page 75: ...Page 25 ULII Series Parts Manual...
Page 77: ...Page 27 ULII Series Parts Manual...
Page 79: ...Page 29 ULII Series Parts Manual ILLUSTRATION OF CE CAGE...
Page 80: ...Page 30 ULII Series Parts Manual Loader Assembly UL25 068194 000...
Page 81: ...Page 31 ULII Series Parts Manual NOTES...
Page 82: ...Page 32 ULII Series Parts Manual Tilt Back Assembly UL32 068200 000...
Page 83: ...Page 33 ULII Series Parts Manual...
Page 84: ...Page 34 ULII Series Parts Manual Tilt Back Assembly UL40 068200 001...
Page 85: ...Page 35 ULII Series Parts Manual...
Page 86: ...Page 36 ULII Series Parts Manual Loader Stop Bracket Assembly 068190 000 Drawing...
Page 87: ...Page 37 ULII Series Parts Manual Loader Bar Assembly 068186 000...
Page 89: ...Page 39 ULII Series Parts Manual...
Page 90: ...Page 40 ULII Series Parts Manual Power Pack Option 068100 001...
Page 91: ...Page 41 ULII Series Parts Manual Electrical Schematic AC 068010 000...
Page 92: ...Page 42 ULII Series Parts Manual Electrical Schematic DC 068010 001...
Page 93: ...Page 43 ULII Series Parts Manual Hydraulic Schematic 068011 002...