29 of 75
7.8 AIR INSTALLATIONS
NOTE: When cutting polytube, be sure to cut the line at 90 degrees. Failure to do
so may result in leaks in the air connections.
1. Locate the 1/4" polytube cross and tee fitting in polybag "C" in hardware kit.
2. Connect the 1/4" polytube from the hose guard (i.e. supply line) to the ¼” pushlock
cross at the front of the left side deck assembly. Connect the opposite end to the
FRL assembly.
See figure 21 & 23
.
3. At the rear of the lift, connect the 1/4" polytube from the deck to the crossmember
polytubes using the tee fitting.
See figure 21
.
Figure 21. Air Connections
4. Connect the 3/8” polytube from the hose guard to the 3/8” fitting at the front of the
left deck assembly (jacking beam air bracket). Before this can be done, remove the
plug and replace with 1/4" NPT - 3/8" polytube straight adapter located in polybag
"C" of hardware kit.
See Figure 22.
5. Connect the opposite end of the 3/8" polytube to the Air Valve and Filter assembly
on the front left tower.
See Figure 23.
Figure 22. JB Air Connections
Summary of Contents for Hofmann ALIGNMENT FPA18210
Page 8: ...8 of 75 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS...
Page 13: ...13 of 75 6 1 TYPICAL BAY LAYOUT Figure 2 Typical Bay Layout...
Page 15: ...15 of 75 Figure 3 Chalk line layout...
Page 44: ...44 of 75 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes...
Page 57: ...57 of 75 12 0 PARTS LIST 12 1 LIFT ASSEMBLY...
Page 59: ...59 of 75 12 3 TOWER ASSEMBLY...
Page 61: ...61 of 75 12 5 DECK ASSEMBLY LEFT SIDE...
Page 63: ...63 of 75 12 7 CROSSMEMBER ASSEMBLY...
Page 65: ...65 of 75 12 9 CYLINDER ASSEMBLY...
Page 67: ...67 of 75 12 11 HYDRAULIC AND AIR KIT...
Page 70: ...70 of 75 12 14CABLE ROUTING...