38 of 75
4. Ensure the proper operation of the approach ramps.
5. Cycle the lift serveral times to check proper operation of the cables, safety locks, air
locks, etc. with and without load.
STOP IMMEDIATELY IF THE LIFT IS NOT OPERATING PROPERLY!
6. Make any necessary adjustments and check again for proper operation.
NOTE:
IF THE LIFT IS EQUIPPED WITH JACKING BEAMS, THIS IS THE
APPROPRIATE TIME TO INSTALL THEM. CONSULT THE JACKING BEAM
INSTRUCTION MANUALS FOUND IN EACH JACKING BEAM BOX.
Before attempting to operate the lift, please ensure that slider guide
surfaces inside the front towers are greased adequately.
7.15 FINAL CHECK OF ASSEMBLED LIFT
Final dimension check after anchoring
Check for air and hydraulic leaks
Ensure cables are properly routed and free from obstructions
Ensure all safety lock mechanism are working correctly
Re-check level of post and decks
Makes sure ramps are secured correctly with cotter pins and washers
Check all fasteners, tighten if necessary
Check direction of flow control (arrow pointed toward power unit).
If jack beams are supplied, ensure keeper bracket are installed
Check jam nuts on cables and safety ladders are tightened
Ensure cable flange clamp at cylinder is installed correctly and tighten
Ensure cylinder shaft Jam Nuts are installed as per instructions
Ensure wheelstops are installed
Ensure wheel chocks are provided
Operate lift to full stroke then lower to ground while checking for proper
functionality
Ensure Customer Care Kit is complete and given to operator
Operation
Manual
ANSI / ALI Lift It Right Manual
ANSI / ALI Safety Tip Card
ANSI / ALI ALIS Safety Requirements for Installation and Service of
Automotive Lifts
ANSI / ALI Quick Reference Guide
Train end user on operation of the lift
Check level of hydraulic oil when the lift is fully lowered
Check the movement of the wire ropes through the entire travel of the lift.
Inspect for any binding or incorrect installation. Pay close attention to
Summary of Contents for Hofmann ALIGNMENT FPA18210
Page 8: ...8 of 75 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS...
Page 13: ...13 of 75 6 1 TYPICAL BAY LAYOUT Figure 2 Typical Bay Layout...
Page 15: ...15 of 75 Figure 3 Chalk line layout...
Page 44: ...44 of 75 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes...
Page 57: ...57 of 75 12 0 PARTS LIST 12 1 LIFT ASSEMBLY...
Page 59: ...59 of 75 12 3 TOWER ASSEMBLY...
Page 61: ...61 of 75 12 5 DECK ASSEMBLY LEFT SIDE...
Page 63: ...63 of 75 12 7 CROSSMEMBER ASSEMBLY...
Page 65: ...65 of 75 12 9 CYLINDER ASSEMBLY...
Page 67: ...67 of 75 12 11 HYDRAULIC AND AIR KIT...
Page 70: ...70 of 75 12 14CABLE ROUTING...