11.1 ISOLATION AND VERIFICATION PROCEDURE:
Table 1: ISOLATION AND VERIFICATION PROCEDURES:
ENERGY
TYPE AND
SOURCE
LOCKOUT
LOCATION
(TO BE
COMPLETED
BY END
USER)
PROCEDURE FOR LOCING
OUT AND OR RELEASING
ENERGIES
VERIFY PROCEDURES
STORED
ENERGY
AND
HYDRAULIC
PRESSURE
3000-5000
PSI
LOWER THE LIFT TO ITS
LOWEST REST POSTION. IF
THE LIFT MUST BE SERVICED
OR MAINTAINED IN THE
RAISED POSITION, ENSURE
THAT THE LIFT IS PLACED ON
THE MECHANICAL LOCKS
AND SUPPORTED BY
SUPPLEMENTARY JACK
STANDS, BLOCKED AT THE
SLIDERS AND A COME ALONG
SECURED BETWEEN THE
SCISSORS.
VERIFY THAT THE LIFT IS
CONTACTING THE
SUPPLEMENTARY JACK
STANDS, THE BLOCKS ARE
SECURLY PLACED AND THE
COME ALONG IS SECURED
BETWEEN THE SCISSORS.
PRESS THE DOWN BUTTON
ON THE CONSOLE AND
VERIFY THAT THE LIFT DOES
NOT LOWER. VERIFY
HYDRAULIC PRESSURE HAS
BEEN REMOVED BY SLOWLY
OPENING THE MAIN
HYDRAULIC FITTING AT THE
POWER UNIT ONLY. IF FLUID
IS PRESENT UNDER
PRESSURE, IMMEDIATLY
TIGHTEN AND REPEAT
LOWER PROCESS. ENSURE
THAT BOTH STRUCTURES
ARE SECURELY PLACED ON
THE STANDS AND BLOCKED.
ELECTRICAL
240VOLTS
AT THE LIFT, PRESS THE
EMERGENCY STOP BUTTON
COMPLETELY TO DE-
ENERGIZE THE CONTROL
BUTTONS.
AT THE DISCONNECT
PLANEL, PLACE THE
DISCONNECT HANDLE IN OFF
POSITION. ATTACH A
MULTIPLE LOCKOUT DEVICE.
LOCK AND TAG.
DANGER: LINE SIDE OF
DISCONNECT REMAINS
ENERGIZED
ATEMPT TO RESTART THE
SYSTEM, THE SYSTEM MUST
NOT START. VISUALLY
VERIFY OPEN DISCONNECTS
AND LOCKING DEVICE
INSTALLED.
Summary of Contents for Hofmann ALIGNMENT FPA18210
Page 8: ...8 of 75 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS...
Page 13: ...13 of 75 6 1 TYPICAL BAY LAYOUT Figure 2 Typical Bay Layout...
Page 15: ...15 of 75 Figure 3 Chalk line layout...
Page 44: ...44 of 75 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes...
Page 57: ...57 of 75 12 0 PARTS LIST 12 1 LIFT ASSEMBLY...
Page 59: ...59 of 75 12 3 TOWER ASSEMBLY...
Page 61: ...61 of 75 12 5 DECK ASSEMBLY LEFT SIDE...
Page 63: ...63 of 75 12 7 CROSSMEMBER ASSEMBLY...
Page 65: ...65 of 75 12 9 CYLINDER ASSEMBLY...
Page 67: ...67 of 75 12 11 HYDRAULIC AND AIR KIT...
Page 70: ...70 of 75 12 14CABLE ROUTING...