24 of 75
Figure 15. Jack Stand setup on Crossmembers
8. Assemble right side deck assembly to front and rear crossmembers.
9. At this point the decks should be completely fastened to the crossmembers and
the threaded portion of each cable should be routed through the crossmembers,
past the lock safety.
Before proceeding, check that the layout matches that shown in Figure 3, that
the lift is square and that there is a 40” gap between the decks along their
entire length. This dimension is critical as it is necessary to allow the
jackbeams to roll freely.
7.3 TOWER ASSEMBLY
1. Each tower will have a safety ladder and hardware packaged inside. See
Section 12.3 Tower Assembly
in parts list.
2. Remove the safety ladder from tower, then remove the hardware from the top
and back of the ladder.
3. Insert the safety ladder into the top plate hole furthest to back of the column.
Keep in place by assembling the 3/4" flat washer and two 5/8" nuts.
4. At the back of the tower, align the holes in safety ladder mounting blocks to the
slots on the tower and assemble the 3/8" hardware.
5. Do not tighten hardware at this time as adjustments to the ladder position will be
required later.
6. Repeat for remaining tower assemblies.
Summary of Contents for Hofmann ALIGNMENT FPA18210
Page 8: ...8 of 75 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS...
Page 13: ...13 of 75 6 1 TYPICAL BAY LAYOUT Figure 2 Typical Bay Layout...
Page 15: ...15 of 75 Figure 3 Chalk line layout...
Page 44: ...44 of 75 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes...
Page 57: ...57 of 75 12 0 PARTS LIST 12 1 LIFT ASSEMBLY...
Page 59: ...59 of 75 12 3 TOWER ASSEMBLY...
Page 61: ...61 of 75 12 5 DECK ASSEMBLY LEFT SIDE...
Page 63: ...63 of 75 12 7 CROSSMEMBER ASSEMBLY...
Page 65: ...65 of 75 12 9 CYLINDER ASSEMBLY...
Page 67: ...67 of 75 12 11 HYDRAULIC AND AIR KIT...
Page 70: ...70 of 75 12 14CABLE ROUTING...