19 of 75
Assemble lower thrust washer and pulley and reinstall the pulley pin to
hold these in place.
Assemble four more thrust washers (as shown) and the top pulley with
front left cable 2-1360 wrapped around the pulley. Push pulley pin further
up to hold these in place.
Install remaining thrust washers and 1" spacer then complete assembly of
pulley pin and lock in place with hardware.
Install rear right cable 2-1363 around the lower pulley.
Figure 7. Rear Pulley Stack Assembly
Figure 8. Front Left and Rear Right Cable Installed at Rear
Summary of Contents for Hofmann ALIGNMENT FPA18210
Page 8: ...8 of 75 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS...
Page 13: ...13 of 75 6 1 TYPICAL BAY LAYOUT Figure 2 Typical Bay Layout...
Page 15: ...15 of 75 Figure 3 Chalk line layout...
Page 44: ...44 of 75 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes...
Page 57: ...57 of 75 12 0 PARTS LIST 12 1 LIFT ASSEMBLY...
Page 59: ...59 of 75 12 3 TOWER ASSEMBLY...
Page 61: ...61 of 75 12 5 DECK ASSEMBLY LEFT SIDE...
Page 63: ...63 of 75 12 7 CROSSMEMBER ASSEMBLY...
Page 65: ...65 of 75 12 9 CYLINDER ASSEMBLY...
Page 67: ...67 of 75 12 11 HYDRAULIC AND AIR KIT...
Page 70: ...70 of 75 12 14CABLE ROUTING...