
8
Ser
vice
MAINTENANCE
HYDRAULIC OIL
1� Use Parker Dura Clean Hydraulic Oil or equivalent of AW32 minimum hydraulic oil�
2� For proper warranty, change oil every 250 hours of use�
3� The oil level in reservoir should be
1-3" from the bottom of the dipstick when fluid is cold. Do not over
-
fill.
4. After changing oil and/or filter, run the machine for a few minutes. Check oil level and check for leaks.
5. Always use caution when filling hydraulic oil tank or checking level to keep system free of contaminants.
Check and service more frequently when operating in extremely cold, hot or dusty conditions�
6. If natural color of fluid is black or smells burnt, it is possible that an overheating problem exists.
7. If fluid becomes milky, water contamination may be a problem.
8. If either of the above conditions happen, change oil and filter immediately after fluid is cool and find
cause�
Take fluid level readings when system is cold.
9� Oil being added to the system must be the same as what is already in the tank�
Mark tank fill area as to
which type you put in�
WHEEL MOUNTING PROCEDURE
1� Turn machine off and remove key�
2� Block one of the other wheels�
3� Loosen nuts slightly on wheel to be removed�
4. Jack up machine being careful not to damage underside of machine.
5� Remove nuts� Remove wheel�
5� Place new wheel on hub lining up bolt holes�
6. Torque nuts to 64-74 ft/lb (87-100 Nm) using a cross pattern. Re-torque after first 8 hours and every 250
hours thereafter�
7� Lower machine to ground and remove blocks and jack�
Summary of Contents for Sand Star Zee 45-501-A
Page 18: ...16 Diagrams HYDRAULIC DIAGRAM ...
Page 20: ...18 Parts ZTR MAIN DRAWING ...
Page 24: ...22 Parts SEAT PANEL DRAWING ...
Page 26: ...24 Parts CONTROL PANEL GAS TANK DRAWING ...
Page 28: ...26 Parts ROLL BAR OIL TANK DRAWING ...
Page 30: ...28 Parts CENTER LIFT LINKAGE DRAWING ...
Page 32: ...30 Parts ELEC HYD REAR LIFT DRAWING ...
Page 34: ...32 Parts REAR HITCH DRAWING ...
Page 36: ...34 Parts ENGINE DRAWING ...
Page 38: ...36 Accessories 45 510 LIGHT KIT DRAWING ...
Page 40: ...38 Accessories 45 502 40 ALUMINUM PLOW DRAWING ...
Page 42: ...40 Accessories 45 502 40 ALUMINUM PLOW DRAWING ...
Page 44: ...42 Accessories 45 503 84 RAKE ASSEMBLY DRAWING ...
Page 46: ...44 Accessories 45 504 FLIP DOWN GRADER BLADE DRAWING ...
Page 48: ...46 Accessories 45 505 SPRING TINE SCARIFIER DRAWING ...
Page 50: ...48 Accessories 45 506 SAND CULTIVATOR DRAWING ...
Page 52: ...50 Accessories 45 507 SCARIFIER DRAWING ...
Page 54: ...52 Accessories 45 509 SCARIFIER DRAWING ...
Page 56: ...54 Accessories 26 007Q PROFESSIONAL INFIELD FINISHER DRAWING ...
Page 58: ...56 Accessories 26 008Q FLEX ACTION FIELD FINISHER DRAWING ...
Page 62: ...60 Accessories 42 392Q 84 213CM Pro Brush TOURNAMENT RAKE DRAWING ...
Page 64: ...62 Accessories Fig 1 Fig 3 Fig 2 42 392Q 84 213CM Pro brush TOURNAMENT RAKE DRAWING ...