56
-
No.JXC
※
-OMU0030-A
Caution
(1) Keep the controller and product combined as delivered for use.
The product is set in parameters for shipment. If it is combined with a different parameter, failure can
result.
(2) Check the product for the following points before operation.
a) Damage to electric driving line and signal lines
b) Looseness of the connector to each power line and signal line
c) Looseness of the electric actuator / cylinder and controller / driver mounting
d) Abnormal operation
e) Emergency stop of the total system
(3) When more than one person is performing work, decide on the procedures, signals, measures
and resolution for abnormal conditions before beginning the work. Also, designate a person
to supervise work other than those performing work.
(4) Actual speed of the product will be changed by the workload.
Before selecting a product, check the catalog for the instructions regarding selection and
specifications.
(5) Do not apply a load, impact or resistance in addition to a transferred load during return to
origin.
In the case of the return to origin by pushing force, additional force will cause displacement of the
origin position since it is based on detected motor torque.
(6) Do not remove the nameplate.
(7) Operation test should be done by low speed. Start operation by predefined speed after
confirming there is no trouble.
[Ground]
Warning
(1) Be sure to ground the electric actuator.
(2)
Grounding should be dedicated ground.
Ground construction is Class D grounding.
(Ground resistance 100 Ω or less)
(3) Make the grounding as close as possible to the electric actuator and shorten the distance to
ground.
[Unpackaging]
Caution
(1) Check the received product is as ordered.
If a different product is installed from the one ordered, injury or damage can result.