
30
5251
5
2022
-
SPS-B
Electrical Installation
Mounting the SCU:
Mount the SCU on a bulkhead perpendicular to the keel, as central as possible in the boat (so it moves as little as possible). A typical location is the
forward or aftward engine room bulkhead. It must be installed with the cable outlet facing DOWN - the direction if it is mounted facing forward or aft, a
setting stating the direction is done in the control panel during setup.
Mounting the FCU:
Mount the FCU close to the actuator and fi n valve unit.
MC_0218
IMPORTANT
The mounting area MUST be vibration free.
MG_0230
Mounting the SCU
Mounting the FCU
Electrical Installation
Mounting the Control Panel:
The main operating panel can be fi tted on the dashboard(s) from the front using four screws with a smooth plastic cover. Or, it can be “flush
mounted” by rear-fi tting using studs or other solutions. The Stabilizer operating panel is a 4,3” sunlight-readable touch panel, that is used for
setup and operation of the stabilizer system as well as other parts of the S-link system.
MC_0218