
19
5251
5
2022
-
SPS-B
MG_0220
1
3
4
2
IMPORTANT
Sealant must be compatible with hull and hull plate
material. Naval architect/Boat builder must confirm
this.
Tighten to
60 Nm
Mechanical Installation
MOUNTING OF THE STABILIZER ACTUATOR ASSEMBLY
1. Apply a coat of watertight sealant externally to the hull surface. Ensure to fi ll around the bolts.
2. Place the External Securing Plate over the Stabilizer shaft & onto the external hull mounting surface.
3. Coat the securing bolts with sealant and insert to the External Securing Plate.
4. Secure each bolt with a plain washer and a nut. Tighten & torque load the securing bolt nuts diagonally to avoid misalignment.
MC_0216
!
Please refer to the graphic for special considerations relating to your model
!
MG_0221
IMPORTANT
Ensure the bonding surface has
no paint and is clean to achieve
correct bonding
Mechanical Installation
MOUNTING OF THE STABILIZER ACTUATOR ASSEMBLY
1. Connect a ground wire from the yachts main bonding/anode system to each actuator using M8 bolt and spring washer in the fi xing point.
MC_0216
!
Please refer to the graphic for special considerations relating to your model
!