Manual_MCS_I_2021-10-002.00_EN.docx
11
3. BEFORE OPERATION
Attention! Use only baskets, that are signed with the Slee logo
inside your MCS I!
3.1 INITIAL FILL UP
After installation the machine needs at first a bottle of mounting media. Slee is strictly
recommending Pertex®. Using other mounting media types can cause damage due to
wrong viscosity and different dry-out processes! Before fill up, Slee recommends to have
a system flush with suitable solvent (when using Pertex® this is xylene).
Especially reagents based on orange substances are known for
sticking mechanical parts within a short time.
Slee does not assume any liability when using other mounting media types and suitable
solvents!!
Insert a bottle, glass or container with xylene into the mounting media holder on the left
inside wall of the unit and put the end of the tubing into this container. The unit is now
prepared for the next steps. Follow step 3.2
3.2 LUBRICATION OF THE PUMPING SYSTEM
To ensure the lubrication of the complete pumping system, it is necessary to keep all
mechanical parts clean and smooth with suitable solvent to protect it from dry out and
sticking. (For best control and least possible fume emission of used solvents, Slee created
refillable cartridges (reservoirs), which easily show the fill level all the time. To refill the
cartridges, you may open the MCS I, after it took in its refill position and opens the
hood after switching on, or anytime during operation, by pressing the “BREAK” button).
Go on with step 3.3.