26
Manual_MCS_I_2021-10-002.00_EN.docx
5. ROUTINE BASICS
5.1 DIRECTION OF SPECIMEN ON THE SLIDES
To be sure, the slides are coverslipped from the correct side, keep sure,
to put all slides in the same direction into the baskets and have the
specimen facing towards you, when hanging them into the stainer
(MAS). It is always the front side, which is being coverslipped. So,
already by starting the staining programs, you have to insert the baskets
with specimen into your direction! When using the MCS I as stand-alone
unit, you will have to do it the same way - put the baskets with
specimen towards you into the loading station.
put specimen
to this side