Section 6 – Additional Procedures
Loading/Unloading
6.3 Loading/Unloading
Know and heed all national, state/provincial and local
rules which apply to transporting of MEWPs.
Only qualified/competent personnel shall operate the
MEWP during loading/unloading.
Be sure vehicle capacity and loading equipment
hoists, chains, straps, etc., are sufficient to withstand
maximum MEWP weight.
The transport vehicle must be parked on a level
surface and must be secured to prevent rolling while
MEWP is being loaded or unloaded.
6.3-1 Loading and Tie-down
1.
Lock turret using turret transportation lock (refer
to
Section 6.3-2
).
2.
Turn key switch to
off position and remove
key before transporting.
3.
Turn main power disconnect switch to
off
position.
4.
Chock MEWP wheels (if necessary).
5.
Remove all loose items.
6.
Anchor down MEWP to transport surface using
tie-down points (refer to
Figure 24
).
7.
Secure boom from side-to-side movement using
lower platform mount between boom end and
platform. Do not use excessive downward force
when securing boom section.
8.
Place block underneath platform rotator and
gently lower rotator onto block and secure in
place. Strap must be secured underneath hoses
and cables to avoid damage to MEWP (refer to
Figure 25
). Do not use excessive downward
force when securing platform.
WARNING
Inspect MEWP for loose or unsecured items.
NOTE
For loading and unloading using a winch line,
refer to
Section 6.1
.
Figure 24
Tie-down Points
Figure 25
Platform Tie-down
Summary of Contents for SJ85AJ
Page 1: ...OPERATING MANUAL SJ85AJ ARTICULATING BOOMS 208932AEA November 2018 AS...
Page 4: ...208932AEA SJ85AJ 4 Notes...
Page 18: ...208932AEA SJ85AJ 18 Notes...
Page 62: ...208932AEA SJ85AJ 62 Notes...
Page 68: ...208932AEA SJ85AJ 68 Notes...
Page 69: ...SJ85AJ 208932AEA 69 Section 7 Technical Diagrams Specifications...
Page 78: ...208932AEA SJ85AJ 78 Notes...
Page 102: ...208932AEA SJ85AJ 102 Notes...
Page 104: ...208932AEA SJ85AJ 104 Notes...
Page 105: ......
Page 106: ...www skyjack com...